BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2024 at 7:00 PM

Updated November 26, 2024

Site work and new construction of a bridge / tunnel in Bridgeport, West Virginia. Conceptual plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

This Project Shall Consist of the Preparation of Contract Plans and Related Documents for the Construction of a New Bridge at the Current Location, While Maintaining Traffic on Existing Routes During Construction. The Professional Services Include Related Documents, Geotechnical Services, and Traffic Engineering Services. A Design Study Will Not Be a Part of These Services. The Consultant Shall Reference Dd-681 and Develop the Appropriate Traffic Management Plan, Which Will Also Be Required. The Consultant Shall Reference Dd-506 and Use Pollution Prevention and Discharge Reduction Methods in the Design. As Part of the Wvdoh's Desire to Facilitate Safety Discussions for Transportation Projects, the Consultant Shall Complete and Submit to the Traffic Engineering Division, the Safety Assessment for Every Roadway (Safer) Form for the Project as Part of the Preliminary Field Review and Final Office Review. Nepa Documentation Will Be Handled in-house by the Technical Support Division. Post Design Services Will Be by Separate Agreement. VIRGINIA AVENUE BRIDGE, located in Harrison County, West Virginia. The structure carries Harrison County Route (CR) 24 over Simpson Creek and is located approximately 0.07 mile north of United States Route (US) 50 in the city of Bridgeport in Harrison County. Description FEDERAL PROJECT (EN) STBG-0024(042)D FEDERAL PROJECT (CN) STBG-0024(044)D Method of payment shall be Cost Plus Fixed Fee. A single assignment will be made for this project. In such instances, a company computed overhead rate may be utilized. It is the policy of the West Virginia Department of Transportation, Division of Highways, that Disadvantaged and Women-owned Business Enterprises shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with Federal funds. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$600,000.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
47
Bidding Soon
829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

Project location map

N Virginia Ave, Bridgeport, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.