BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Forest Lake, Minnesota. Completed plans call for the renovation of a educational facility.

The overall project consists of Mechanical upgrades, electrical, plumbing, and interior finishes, concrete, roofing, structural steel, rough carpentry as it relates to construction activity. The work will be constructed in accordance with the Project Schedule. Bid Security: Each bid shall be accompanied by Bid Security equal to five percent (5%) of amount of maximum bid submitted (including additive alternates) in the form of a certified check, cashier's check, or paper bid bond. Bid security shall be made payable to Owner, as guarantee that Bidder will, if awarded, enter into Contract in accordance with Contract Documents and submitted Bid. This bid security will be uploaded to online. All qualified applicants/bids will receive consideration for employment without regard to race, color, creed, religion, national origin, sex, sexual orientation, disability, age, marital status, status with regard to public assistance, protected veteran status, or any other protected characteristic. Kraus-Anderson Construction Company is an Equal Opportunity Employer and hereby provides notice of its compliance with 41 C.F.R. 60-1.4; 41 C.F.R. 60-4.2; 41 C.F.R. 60-4.3; 41 C.F.R. 60-250.5; 41 C.F.R. 60-300.5; 41 C.F.R. 60-741.5; 41 C.F.R. 61-300.10; and 29 C.F.R. Part 471 Appendix A to Subpart A, which are hereby incorporated by reference.

Post-Bid

Educational

$1,000,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
85
Bidding Soon
789
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

img_map_placeholder

To Be Determined, Forest Lake, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.