BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a water / sewer project in Palm Coast, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

This Request for Statement of Qualifications is Issued for the City of Palm Coast Toreceive Responses From Qualified General Contractors for Construction Manager at Risk (Cmar) Services- Palm Coast Wwtf No.1 Upgrade and Expansion Question Deadline 12/11/2024 at 2:00 PM ET Any questions concerning the intent, meaning and interpretations of the solicitation documents including the draft agreement, must be requested in writing through the portal at least seven (7) calendar days prior to the due date All submittals will be evaluated by City staff in accordance with the criteria set forth in the solicitation documents. The City reserves the right to reject all submittals, to waive any formalities, and to solicit and re advertise for new bids/proposals, or to abandon the project in its entirety. Persons with disabilities needing assistance to participate in any of the proceedings should contact the City Human Resource Office ADA Coordinator at 386-986-3718 at least forty-eight (48) hours in advance of the public opening, pre-bid meeting, or any other proceeding related to this bid/proposal. The existing City of Palm Coast Wastewater Treatment Facility No. 1 (WWTF-1) is a conventional activated sludge domestic wastewater plant with a permitted Annual Average Daily Flow (AADF) capacity of 6.83 million gallons per day (MGD). The WWTF-1 upgrade and expansion will include adding 4.0 MGD, ADDF treatment processes to achieve advanced wastewater treatment (AWT) and upgrading the existing oxidation ditches of 6.83 MGD to achieve AWT. It is proposed that the existing plant of 6.83 MGD be upgraded to achieve AWT by the following tasks: 1. Dividing each oxidation ditch into three zones including an Oxic Zone, a post-Anoxic Zone and a Reaeration Zone. 2. Addition of a Fermentation Tank and a Pre-Anoxic Tank next to each ditch. 3. Modification and addition of the aeration system for the AWT needs. 4. Modification of piping systems from the headworks to the process tanks. The expansion will add a 4.0 MGD, AADF capacity treatment process by the following units to meet the AWT requirements: 1. Additional influent pump station 2. Additional headworks - grit removal and screen equipment 3. Odor control system 4. Flow equalization tank with aeration and mixing equipment. 5. Flow equalization pumping system 6. Anerobic tanks 7. Pre-Anoxic tanks 8. Aeration tanks (oxic tanks) 9. Post-Anoxic tanks 10. Reaeration tanks 11. Blower Systems, diffuser systems and DO control system for the oxic zones and reaeration zones 12. Mixing equipment for all anaerobic, fermentation and anoxic tanks 13. Return activated sludge pumps and internal recycle pumps 14. Clarifiers 15. Sludge holding tanks 16. Disk filters 17. Chlorine Contact Chambers (CCC) 18. Reclaimed water transfer pumps 19. Chemical feed systems including alum, Micro-C, sodium hypochlorite, polymer and other chemical storage and feed systems 20. 6.0 MG ground storage tank 21. Any other needed improvements for the WWTF-1 upgrade and expansion The City of Palm Coast is soliciting responses to this RFSQ from qualified individuals or firms to provide professional Construction Management at Risk (CMAR)servicesfor the City's WWTF No. 1 Upgrade and Expansion. WWTF-1 is located at 26 Utility Drive, Palm Coast, FL. The CMAR services for the Palm Coast WWTF-1 upgrade and Expansion will be included in the following Two (2) Task Orders: Task Order No.1: Pre-Construction Services associated with the Proposed WWTF No. 1 Upgrade and Expansion. Task Order No.2: Construction Phase Services associated with the Proposed WWTF No. 1 Upgrade and Expansion.

GC Bidding

Water / Sewer

$400,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
56
Bidding Soon
1,155
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

April 21, 2025

img_map_placeholder

To Be Determined, Palm Coast, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.