BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving and new construction of a mixed-use development in Belton, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project includes, but is not limited to: Bridge construction, retaining wall construction, street construction, sidewalk construction, waterline construction, erosion control, traffic control, etc. Bids must be submitted on the Bid Form provided and must be accompanied by a cashier's check, certified check or acceptable bidder's bond payable without recourse to the City of Belton, Texas in an amount not less than five (5) percent of the bid submitted as a guarantee that the bidder will enter into a contract and execute a Performance Bond and a Payment Bond within ten (10) days after the notification of the award of the contract. The City of Belton reserves the right to accept or reject any and all bids, as the best interest of the City may require, and to waive any informality in bids received. Question Deadline 04/24/2026 at 12:00 PM CT The deadline to ask questions - Online portal.

Post-Bid

Bridges / Tunnels

$5,100,000.00

Public - City

Demolition, New Construction, Paving, Site Work

292

25

6

5

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
133
Bidding Soon
2,226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

July 6, 2026

Project location map

E Central Ave, Belton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.