BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Alexander City, Alabama. Completed plans call for the renovation of a municipal facility.

[section 3, Minority- and/or Women-owned Businesses Are Encouraged to Respond] Roofing - GHA During the period between issuance of this RFP and the proposal due date, no oral interpretation of the RFP's requirements will be given to any prospective respondent. Requests for interpretation must be made, in writing, by the questions due date and time as indicated on the coversheet (first page) of the RFP and send to: Email: michellewingler@alexcityhousing.org The Contractor is to provide all materials, tools and labor necessary to install new architectural shingles on roofs of apartments: o Mountain View apartments 101-106 & 119-124 o Highlands apartments 125-140 o The Contractor will need a generator for electricity. Use of tenants' apartments for electricity will not be allowed. o Before installing new roofing materials all old felt must be removed in order to inspect roof decking condition. o Any rotted, damaged or loose decking must be repaired before installing shingles. o Provide a separate per sheet price (labor only) for replacement of any decking. Materials will be purchased by the Housing Authority o Provide a separate per hour price (labor only) for replacement of any damaged fascia wood or metal. Materials will be purchased by the Housing Authority. o Any new decking must be a minimum of 7/16 in in thickness or matching original decking if it is thicker o Eave material must be at least as wide as existing metal so as to properly cover existing fasci a metal by a minimum of 1/2 ". o Replacement felt must be of a synthetic variety and fastened in accordance with manufacturer's specification o Starter shingles must be used and have a minimum 3/8 " and maximum 3/4 " overhang past drip edge o All valleys must have a layer of ice & water shield applied before shingles are laid o Valleys must be woven or California cut o Shingles must be laid according to manufacturer's specifications and must meet all codes for central Alabama o Shingle-over ridge cap will be used even if these are not on original roof o All roof vents must be replaced with similar new roof vents o All materials should match existing materials as closely as possible. Any deviation from this must be discussed and accepted by GHA/ACHA before proceeding with work o Any construction issues not noted in scope of work but become revealed during construction must be immediately brought to the attention of GHA/ACHA o Contractor must use methods that keep damage to lawns and shrubbery to a minimum o If damage should occur, contractor will be responsible for suitable repairs o All equipment must be operated in a safe manner and should not hinder traffic flow except for short periods of time o All construction debris is the responsibility of the contractor and must be disposed of properly o Areas around buildings and dumpsters must be swept for nails and tacks every day o Any damage to personal property as a result of the work will e the sole responsibility of the contractor o During construction, the area must be kept clean and safe at all times LAST DAY FOR QUESTIONS: Thursday, December 2,2024, at 2:00 pm (CST)

Sub-Bidding

Municipal

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
27
Bidding Soon
647
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 13, 2025

img_map_placeholder

To Be Determined, Alexander City, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.