Renovation of a detention facility in Greeley, Colorado. Completed plans call for the renovation of a detention facility.
Reference Number 0000369042 Bid Intent Not Available Weld County is seeking bids for a turn-key lump sum project for a vendor to provide roofing services to remove and replace the existing EPDM North Jail 2 East roof. Question Deadline 12/11/2024 at 5:00 PM MT Questions are submitted online No, An email confirmation will be sent when your bid has been received. Please call Purchasing at 970-400-4222 or 4223 with any questions. Questions email: bids@weld.gov Weld County reserves the right to reject any and all bids, to waive any informality in the bids, to award the bid to multiple vendors, and to accept the bid that, in the opinion of the Board of County Commissioners, is to the best interests of Weld County. The scope of this project is for the removal and replacement of a section as shown on attachment 2 of the existing EPDM roof and underlayment at the Weld County North Jail 2 East Roof complex. 1. Remove and replace approximately 36,700 square feet of existing EPDM roofing and underlayment of the North Jail 2 East roof. See attachment 2 for roof section. Contractor is responsible to verify actual dimensions during pre-bid walk through. 2. Existing EPDM roofing and any underlayment, including existing rigid insulation shall be removed in its entirety. 3. New EPDM roofing shall be fully adhered, and a Carlisle system to match existing roofing system and warranties. 4. New roof shall be placed on new rigid insulation with cover board to match the existing slopes and as required by the manufacturer to maintain warranty. 5. Roof shall carry a 20-year manufacturers and installation warranty. The 20-year warranty will be for Labor and Materials. This will require the inspection of the manufacturer to certify warranty. Results are to be provided to Weld County. 6. Contractor shall be responsible for all wood blocking and cants to match existing, and as necessary for a complete warrantied roof assembly. 7. New walkway pads shall be provided as needed and required by roofing manufacturer or directed by owner. These shall consist of approximately 300 lineal feet of walkway. 8. All existing wood pipe supports are rotted and need to be replaced. Provide new rubber or composite pipe supports that are compatible with the new roofing. 9. All penetrations, transitions, term-bars and terminations inside of scuppers shall be properly sealed and meet manufacturer's warranty requirements. Some penetrations may be obsolete and can be removed with coordination of County representatives. 10.Contractor is required to furnish and install new Zurn anchored screens at all roof drains. 11.Installation of new cover board will be as required by manufacturer for warranty. board and fasteners shall comply with manufacturer's specifications. 12.Roof will be installed/attached in accordance with manufacturer's recommendations 13.Provide manufacturer cut sheets and warranty information with bid. 14.Existing roof top units shall be flashed, and counter flashed per roofing manufacturers written directions. 15.Access to roof during business hours may be through the roof hatch/ladder. Afterhours contractor will need to access by other means with approval of Weld County project manager. 16.Metal cap flashing shall be replaced. Color selected by owner from standard selection that closely matches existing. 17.All work is to be performed at a secured detention facility. Normal work hours are 7:00 am to 5:00 pm. 18.Contractor is responsible for always providing a watertight roof. This is a 24-hour facility with inmates and staff at all times and cannot be closed. 19.All personnel working or visiting the work site must submit a background authorization form and be approved by the Weld County Sheriffs office. Contractor shall submit and coordinate the authorization forms through the Weld County project manager. 20.Contractor is responsible for all electrical, plumbing, and mechanical disconnections and reconnections that may be required to perform their scope of work and all cost shall be included in their bid.
Bid Results
Jails / Prisons
$435,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2024
January 20, 2025
2110 O St, Greeley, CO
Related To This Project
Greeley, CO
Bid Date: Dec 19 2024
Greeley, CO
Bid Date: Jan 21 2025
Greeley, CO
Bid Date: Dec 20 2024
Greeley, CO
Bid Date: Dec 06 2024
Greeley, CO
--
Greeley, CO
--
Greeley, CO
Bid Date: Jan 30 2026
Greeley, CO
Bid Date: Dec 04 2024
Greeley, CO
--
Greeley, CO
Bid Date: Nov 22 2024
Greeley, CO
Bid Date: Feb 05 2021
Greeley, CO
Bid Date: Feb 24 2021
Greeley, CO
Bid Date: Dec 19 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.