Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Columbus, Nebraska. Contact the soliciting agency for additional information.
The Owner will consider the bids received for the furnishing of said labor, materials and equipment necessary for the proper construction of the aforesaid project. The General, Mechanical and Electrical, will be under one Bid. All subcontractor quotations shall be sent to the General Contractor. Bid Security is required to be submitted with bid proposal form. Make payable to Central Community College in the amount of 5% of the Lump Sum Bid Amount. Bid Security shall be of cashiers check, certified check, or Bid Bond issued by a Surety licensed to conduct business in the State of Nebraska. Form of Bid Bond is AIA Document A310. Any agent signing a bid bond on behalf of the Surety must attach a Power of Attorney effectively evidencing the agent's authority to bind the Surety to the performance of the Bid Bond. Performance Bond: The Contractor shall be required to furnish acceptable bonds to complete the work and pay for all labor and materials used, said bonds to be in the amount of 100% of total amount of the Contract. Taxes: The Contractor by virtue of his contract with Central Community College, becomes a purchasing agent for the Owner on their behalf and under Statute 77-2702 does not pay sales tax . G. Insurance: Prior to the start of the work, completed copies of the Certificate of Insurance, AIA Document G705 shall be submitted to the Owner and Architect. 1.02 PROJECT SUMMARY Project Name: Central Community College Columbus PEC Auxiliary Gym Equipment Project Address: 4500 63rd Street , Columbus, Nebraska 68602. The Contract Documents, dated November 25 , 20 24 prepared for the project by Wilkins Architecture Design Planning, L.L.C. The work consists of providing and installing interior motorized retractable batting cages in the existing auxiliary gym in the Physical Education Center (PEC) on the Central Community College Columbus Campus. Project scope also includes replacement of ACP ceiling and associated electrical with ceiling replacement new batting cages. CONTRACT DESCRIPTION A. Contract Type: A single prime contract based on a Stipulated Price as described in Document 00 5200 - Agreement Form. B. Project will be constructed under one general construction contract. 1.04 OWNER OCCUPANCY A. Owner intends to occupy the Project upon Substantial Completion. B. Schedule the Work to accommodate Owner occupancy 1.05 CONTRACT TIME A. The bidder, in submitting an offer, accepts the Contract Time period stated for performing the Work. The completion date in the Agreement shall be the Contract Time added to the commencement date. 1.06 WORK SEQUENCE A. ALL WORK MUST BE COMPLETED WITHIN THE SCHEDULE NOTED. The Work shall be conducted in a single phase as described in the schedule below: TBD : Contractors interviews in Central Community College - Grand Island, Administration Office Board Room 80. January 16, 2025 : Low bid contractor recommendation presented to Board of Governors. January 23, 2025 : Contract awarded: Start Digital Document Submittal Service (ORACLE, Submittal Exchange) and Administrative Requirements. May 9, 20025: College Graduation May 13, 2025: Construction Starts July 1, 2025 : Substantial Completion July 18, 2025 : Final Completion A. Bid Documents: Contract Documents including Project Manual, Construction Drawings and all issued Addendums. If shipping is required there is a non refundable amount determined and made payable to Standard Digital Imaging These checks are to be sent to Standard Digital Imaging prior to receipt of documents. D. ALL BID DOCUMENTS SHALL BE RETURNED to the office of Wilkins Architecture Design Planning, L.L.C., 2908 West 39th Street, Suite A, Kearney, Nebraska, 68845. A. No technical questions will be answered by the Architect's /Engineer's office(s) during the twenty-four (24) hours immediately preceding the bid opening time and date. B. All products and manufacturers shall be as specified in the bid documents. Any requested changes in products or manufacturers shall be submitted to the Architect seven days prior to the bid date. Requested changes that have been approved will be included in an addendum. Any requested changes not included in an addendum are to be considered as not approved. The Owner reserves the right to negotiate any proposed Voluntary Alternates only with the apparent low bidder with selection based on the Base Bid and selected Alternate(s). C. The Architect does not intend to issue any addenda to the bidding documents within three (3) working days of the bid opening time and date. A. Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the bid closing date. A. The Owner and Contractor shall have the right to reject any or all bids, which are in any way incomplete or irregular, and to waive any informality in any proposal.
Sub-Bidding
Educational
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2024
May 13, 2025
4500 63rd St, Columbus, NE
Related To This Project
Columbus, NE
Bid Date: Dec 12 2024
Columbus, NE
Bid Date: Jan 14 2025
Columbus, NE
Bid Date: Dec 23 2024
Columbus, NE
Bid Date: Jan 06 2025
Columbus, NE
Bid Date: Dec 12 2024
Columbus, NE
Bid Date: Dec 05 2024
Columbus, NE
--
Columbus, NE
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.