BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2024 at 7:00 PM

Updated December 31, 2024

Site work and paving for a road / highway in Junction City, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work covered by this section includes furnishing all plant, labor, equipment, materials, and transportation necessary for demolition and disposal of bituminous and concrete pavements, sidewalks, driveways, curb and gutter, sanitary sewer, water, gas pipe and other items as directed and as indicated on the plans. All Questions Should Be Directed To Dustin J. Day, P.E. Kaw Valley Engineering, Inc. 2319 N. Jackson Street Junction City, Kansas 66441 Office: 785-762-5040 Mobile: 785-223-7138 Email: Day@kveng.com construction of 2025 Alley Repairs The OWNER reserves the right to reject any and all bids, and to waive any formalities in any bid.

Award

Roads / Highways

$500,949.00

Public - City

Paving, Site Work

23

10

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
28
Bidding Soon
398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 6, 2025

Project location map

Multiple Locations, Junction City, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.