BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2025 at 7:00 PM

Updated January 28, 2025

Renovation of an educational facility in Haverhill, Massachusetts. Completed plans call for the renovation of a educational facility.

Project Northern Essex Community College (NECC) is soliciting competitive sealed bids for the addition of remote locks and monitoring to 53 exterior building doors and five motion sensors. Bids should also include pricing for new Genetec door access Cloud link board. The Project consists of but not limited to: The project consists of but not limited to the addition of remote locks and monitoring to forty (40) exterior building doors and five (5) motion sensors located on the Haverhill Campus. Bids should also include pricing for new Genetec door access Cloudlink board. There are 5 buildings in total (Buildings A,TC,G,C, and Pump House), each building currently has at least one exterior door with electronic door access and locking capabilities. Adjacent doors are still standard manually operated doors and will need to be converted to operate with door access reader. Location-100 Elliott Street, Haverhill, MA 01830 The work is estimated to cost $120,000.00. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. 15.3% for minorities and 6.9% for women.

Award

Educational

$103,587.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
194
Bidding Soon
3,784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 6, 2025

Project location map

100 Elliott St, Haverhill, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.