BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in West Bridgewater, Massachusetts. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The work of this contract generally consists of the construction of a new 1.8 million gallon per day Cyr Street and Norman Avenue Iron and Manganese Water Treatment Plant. Participation in the bidding phase of this Project will be limited to General Contractors and Subcontractors who have submitted a SOQ (and required supporting documentation) in response to the RFQs and have been deemed qualified by the Town of West Bridgewater Water Department. Any contractor seeking to be prequalified as both a General Contractor and Subcontractor for a particular filed sub-bid trade(s) is required to file separate responses to BOTH the RFQ issued to prospective General Contractors and the RFQ issued to prospective filed Subcontractors for this Project. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. If indicated in Section I, a site visit will be available during the RFQ Phase. (If applicable, attendance is optional for those interested in responding to the RFQ.)

Post-Bid

Water / Sewer

$14,700,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
123
Bidding Soon
2,243
All Active Projects
870
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

July 15, 2025

img_map_placeholder

Multiple Locations, West Bridgewater, MA

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.