Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Renovation of a fire / police facility in Beloit, Wisconsin. Completed plans call for the renovation of a fire / police facility.
APPROXIMATELY: REMOVE AND REPLACE EXISTING CABINETS AND MISCELLANEOUS ITEMS ASSOCIATED WITH ABOVE WORK. TIME: No Bids Received. BIDS: All Bids shall be addressed to the City Engineer and shall be enclosed in a SEALED ENVELOPE, marked with the name and address of the Bidder, Project Title and the Contract Number for which the bid is being submitted. All bidders shall bid in accordance with, and shall bid upon the bid forms included in the Contract Documents. BIDDER'S PROOF OF RESPONSIBILITY QUESTIONNAIRE: All Bidders must execute and file a Bidder's Proof of Responsibility Questionnaire no later than the close of business on November 28, 2024 which is seven (7) calendar days prior to the bid opening. It is incumbent on the bidder to supply the required documentation in sufficient time to be evaluated before this deadline. Forms are available at the Utilities and Engineering Facility. LEGAL PROVISIONS: The Contract letting shall be subject to the provisions of Section 62.15, 66.0901, and 66.0903 of the Wisconsin Statutes, as well as any other applicable sections thereof. BID SECURITY: A certified check or satisfactory Bid Bond payable to the City of Beloit in the amount of 5% of the Bid shall accompany each bid as a guarantee, that if the bid is accepted, the bidder will execute and file the Agreement, the Contract Performance Bond and Payment Bond, as required by the Contract Documents, within ten (10) days after the Notice of Award of the Contract by the City of Beloit. Failure of the part of the Bidder to do so will result in forfeiture of the Bidder's certified check or Bid Bond to the City of Beloit as liquidated damages. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the City of Beloit for 110% of the Contract Price for each of the above Bonds, in accordance with the requirement of the Contract Documents. BID REJECTION: The City of Beloit reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serve the interests of the City of Beloit. BID WITHDRAWAL: No bid shall be withdrawn for a period of sixty (60) days after the scheduled opening of the bids without the consent of the City of Beloit. Question Deadline 11/28/2024 Per owner all bids were rejected, and this will re-bid at a future time and date TBD. Questionnaire no later than the close of business on Thursday, January 30 which is seven (7) calendar days prior to the bid opening. Complete all work needed to remove existing kitchen and pantry cabinets, replace with new cabinets, install additional shelfing in pantry and replace desk in front office.
Bid Results
Fire / Police
$35,335.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
March 10, 2025
1048 McKinley Ave, Beloit, WI
Related To This Project
Beloit, WI
--
Beloit, WI
--
Beloit, WI
--
Beloit, WI
--
Beloit, WI
Bid Date: Feb 21 2025
Beloit, WI
Bid Date: May 01 2025
Beloit, WI
Bid Date: Mar 05 2025
Beloit, WI
Bid Date: Nov 25 2024
Beloit, WI
Bid Date: Dec 12 2024
Beloit, WI
Bid Date: Mar 07 2025
Beloit, WI
Bid Date: Nov 04 2024
Beloit, WI
--
Beloit, WI
Bid Date: Oct 10 2024
Beloit, WI
Bid Date: Oct 08 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
