BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Site work and paving for a sidewalk / parking lot in Beloit, Wisconsin. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Solicitation Id: SW-07 Route : STH 081E, USH 051N Limit : Mckinley Avenue to 3rd Street, City of Beloit Various Locations County : Rock County Anticipated Construction Cost:$2,000,000-$2,999,999 Assistance is Needed for Real Estate Acquisition for Curb Ramp Upgrades. Modernization Project to Reconstruct Curb Ramps at Approximately 78 Locations Along Wis 81 in the City of Beloit, Rock County. Work at Each Location is Limited to Reconstruction of Concrete Sidewalk, Installation of Detectable Waring Fields, Minor Grading, and Concrete Curb and Gutter Replacement Including 72 Quadrants at 19 Intersections, 2 Ramps at a Multi-use Pedestrian/bicycle Path Located East of 3rd Street, 2 Ramps at a Midblock Crossing Located East of 10th Street, 2 Ramps at a Multi-use Pedestrian/bike Path Located at 5th Street. 5340-01-22: Turn-key Acquisition Including Introduction Letters, Review of Title Work, Encroachment Removal Letters and Revocable Occupancy Permits, Sales Study/data Book, Nominal Payment Parcel Report, Appraisals if Needed, Negotiations Including All Reads Input and Offering Packages, Closing Out Parcel Files to Include Recording of All Documents, W-9 Information, Sending of Six-month/two-year Deed Letters, and Complete a Final Audit Verifying That All Information is in Reads at the End of the Project. Approximately 67 Parcels Are Anticipated Including Approximately 14 With Fee, 52 With Tle , 1 With He. 5989-03-20 Turn-key Acquisition Including Introduction Letters, Review of Title Work, Encroachment Removal Letters and Revocable Occupancy Permits, Sales Study/data Book, Nominal Payment Parcel Report, Appraisals if Needed, Negotiations Including All Reads Input and Offering Packages, Closing Out Parcel Files to Include Recording of All d . DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 03/01/2025 Anticipated Project Completion Date: 12/01/2027 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Monroe - Beloit *The Value for This Project is Based on a Financial Range. The Value is Listed as the Highest Possible Cost From the Range Provided by a Stakeholder or Official Project Document.

Conceptual

Sidewalks / Parking Lot

$2,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
530
Active Projects
247
Bidding Soon
3,738
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

Project location map

Multiple Locations, Beloit, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.