BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2025 at 7:00 PM

Updated January 17, 2025

Renovation of a military facility in West Menlo Park, California. Conceptual plans call for the renovation of a military facility.

As of January 16, 2025, this is a sources sought notice that is used by the owner for research survey purposes only. At this time, it is not known when a solicitation will be issued. .............. THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or emailing the procurement specialist identified on this Sources Sought posting. SLAC B750 Clean Room Project - Design-Bid-Build SLAC is looking to create a clean working environment for the fabrication of critical equipment that will be used in the next phase of LCLS II HE in 2026. For SLAC to build the required materials a space is needed to ensure a stable controlled setting to allow the work to commence. This project consists of building out a 900 square foot class 100K cleanroom (assembly room) module and the installation of a new air handling unit inside B750 at SLAC. To do this the project requires the installation of a prefabricated equipment assembly room furnished by SLAC. The room will consist of a gowning room, cleanroom and assembly room. All required utilities to meet the standards set forth by the end users as called out on the Room Data Sheet will be installed and connected as part of this project. Minimum Qualifications The Offeror's General Contractor's license has not been revoked within the past five (5) years. The Offeror's company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts. Neither the Offeror's firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract. Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror's company cannot have any U.S. projects within the past five (5) years that have been terminated for default. The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities Scope All design elements and requirements as laid out on design drawings. Below you will find the key elements further defined in the drawings. Provide polished concrete flooring (to be installed prior to the cleanroom being assembled) Address all ADA compliance requirements as called out in the design documentation Handicap parking lot spaces and associated signage Bathroom modifications (Remove toilet partition, liquid soap dispenser relocation flip door orientation for 1'-6" clearance on pull side. Repaint door and reinstall signage on exterior of door. Patch and repair all holes from equipment removed/relocated. Sloped Walkway outside of the southside exit door Install equipment assembly room (SLAC furnished, GC installed) Per the notes on S2.0, the design-build contractor responsible for duct supports on the roof will need to coordinate loading with the clean room designer such that live load and all superimposed dead loads (ceiling, lights, MEP systems, etc.) are within the 25psf combined load allowance. All submittals/shop drawings as called out on the cover sheet of the design package (Fire alarm, Fire sprinkler mods, and structural support of mechanical ductwork. Clean room Module will be ran, furnished and provided by SLAC.) Mechanical: Installation of HVAC system for new 100k cleanroom Installation of exhaust system for new 100k Cleanroom All equipment, material and installation to be provided by the contractor (not including the cleanroom shell, which SLAC provides). This is to include all plumbing, ductwork, and controls; tie-ins and startup/commissioning. The Air handler, condenser, and other such material will be the contractor's responsibility to procure and install, once submittal is approved by the engineer of record. Installation of process piping Electrical: Provide 480V power for the new AC unit Provide power for the prefabricated cleanroom, lighting, HEPA/FAN units Provide power for receptacles and special outlets for lab equipment Provide fire alarm horns strobes, duct smoke detectors for automatic fan shut down, deferred shop drawing submittal for BIO approval by fire alarm sub Bid for new transformer, in event existing transformer fails. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

$500,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
166
Bidding Soon
2,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2025

Project location map

To Be Determined, West Menlo Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.