BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2025 at 7:00 PM

Updated January 10, 2025

Site work for a playground / park / athletic field in Jonesboro, Georgia. Completed plans call for site work for a playground / park / athletic field.

As of January 9,2025, project was awarded to Shephard’s Fence, awarded amount is $24,840.66. Reference Number 0000369186 Removal of existing fencing and the installation of new wooden fencing at designated Clayton County Parks, specifically Rex Park, Jim Huie Recreation Center, and Independence Park. The objective is to enhance park aesthetics, safety, and functionality through the installation of durable wooden fencing. Question Acceptance Deadline 12/02/2024 05:00 PM EST Questions are submitted online Yes 3. SPECIFICATIONS FOR FENCING AT REX PARK 3.1. Location: Rex Park, 3499 Rex Rd, Rex, GA 30273. 3.2. Remove and haul off existing fencing including all posts, post footings, gates, tension wire, and top rail. 3.3. Install approximately 238 feet of 4' two-rail wood fencing using 2x6 rails and 6x6 pyramid posts. 3.4. Posts shall be cemented 2 feet into the ground. 4. SPECIFICATIONS FOR FENCING AT JIM HUIE RECREATION CENTER 4.1. Location: Jim Huie Recreation Center, 9045 Tara Blvd, Jonesboro, GA 30236. 4.2. Remove and haul off approximately 749 feet of split rail fencing, including all posts, post footings, gates, tension wire, and top rail. 4.3. Install approximately 749 feet of 4' two-rail wood fence with 2x6 runners, featuring 45-degree angles cut at the top on each side. 4.4. Posts shall be cemented 2 feet into the ground. 5. SPECIFICATIONS FOR FENCING AT INDEPENDENCE PARK 5.1. Location: Independence Park, 8970 Thomas Road, Jonesboro, GA 30238. 5.2. Remove and haul off existing fencing including all posts, post footings, gates, tension wire, and top rail. 5.3. Install approximately 304 feet of 4' two-rail wood fence. 5.4. Install a 2" post and duck bill at the existing barricade gate to facilitate keeping the gate open. 5.5. Posts shall be cemented 2 feet into the ground.

Award

Playgrounds / Parks / Athletic Fields

$24,841.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
5
Bidding Soon
1,286
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

Multiple Locations, Jonesboro, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.