BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construct 6-Lane Underpass with Sidewalks and Bikeways within the ROW extending under US 290 and the UP Railroad connecting to Skinner Road to the north PROJECT NO.: HG2310060.3.1 Highway (CCSJ) US 290 Contract Type Federal Type of Work (Controlling Project) Highway Improvement Bidder Pre-qualification Waiver No Limits From US 290/Greenhouse Rd, From Mound Rd Limits To Skinner Rd at US 290 Project Description Construct 6-Lane Underpass with Sidewalks and Bikeways within the ROW extending under US 290 and the UP Railroad connecting to Skinner Road to the north Working Day Type (CCSJ) Working Days Max. Maximum Number Of Working Days 864 TXDOT - Highway Improvement - US 290

Post-Bid

Roads / Highways

$79,797,574.00

Public - State/Provincial

Paving, Site Work

1325

11

5

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
259
Bidding Soon
3,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.