Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 22, 2026 at 7:00 PM
Updated January 23, 2026
Site work for a transportation facility in Dayton, Texas. Conceptual plans call for site work for a transportation facility.
Construct Grade Separation at Up Railroad Tracks Hwy: US 90 County : Liberty District : Beaumont Limits From at Up Railroad Limits to TXDOT- Construct Grade Separation at Up Railroad Tracks - US 90 This project is in the Statewide Transportation Improvement Program. As of January 22, 2026, no details have been provided about the design firm or general contractor, and neither the construction schedule nor the anticipated completion date has been announced. *project Information Has Been Obtained Through a Public State Transportation Improvement Plan (Stip). A Stip is a Financial Schedule for Short- and Long-range Projects Which is Updated Regularly. Information Listed in the Stip Often Evolves Based on Funding Availability. The Project Details, Including Timeline and Value, Are Subject to Change. The Content Management Team Will Continue to Pursue Additional Details as They Become Available.
Conceptual
Transportation Terminals
$56,270,196.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2027
US-90, Dayton, TX
Related To This Project
Dayton, TX
--
Dayton, TX
--
Dayton, TX
Bid Date: Oct 10 2025
Dayton, TX
Bid Date: Feb 05 2019
Dayton, TX
--
Dayton, TX
Bid Date: Aug 12 2025
Dayton, TX
Bid Date: Jul 24 2025
Dayton, TX
Bid Date: Jul 16 2025
Dayton, TX
Bid Date: Jul 08 2025
Dayton, TX
Bid Date: Jun 16 2025
Dayton, TX
Bid Date: Jun 18 2025
Dayton, TX
Bid Date: May 22 2025
Dayton, TX
Bid Date: Jun 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
