BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2024 at 7:00 PM

Updated January 3, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Sugar Creek Township, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

City/County Madison This project includes the removal of an existing single-span structure and constructing a new single-span precast deck beam bridge. Other improvements include earthwork, pipe culverts, riprap, aggregate surface course and other appurtenant work. Tree Removal (6 - 15 units) - 37 Unit Tree Removal (over 15 units) - 269 Unit Earth Excavation - 277 Cu Yd Seeding, Class 2A - 0.1 Acre Stone Riprap, Class A4 - 267 Sq Yd Agg Surface Course, Type A - 102 Ton HMA Surface Cse, IL 9.5 FG - 12 Ton Concrete Structures - 28.3 Cu Yd Precast Concrete Bridge Slab - 1201 Sq Ft Reinforcement Bars, Epoxy Coated - 6210 Pound Steel Railing, Type SM - 85 Foot Driving Piles - 520 Foot Project Location: Waffler Road over Spanker Branch, 0.38 miles north of Lee Road Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal of an Existing Single-span Structure and Constructing a New Single-Span Precast Deck Beam Bridge

Post-Bid

Bridges / Tunnels

$10,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

20

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
135
Bidding Soon
1,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

February 3, 2025

Project location map

Waffler Rd, Sugar Creek Township, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.