EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 27, 2024 at 7:00 PM

Updated January 3, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Sugar Creek Township, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

City/County Madison This project includes the removal of an existing single-span structure and constructing a new single-span precast deck beam bridge. Other improvements include earthwork, pipe culverts, riprap, aggregate surface course and other appurtenant work. Tree Removal (6 - 15 units) - 37 Unit Tree Removal (over 15 units) - 269 Unit Earth Excavation - 277 Cu Yd Seeding, Class 2A - 0.1 Acre Stone Riprap, Class A4 - 267 Sq Yd Agg Surface Course, Type A - 102 Ton HMA Surface Cse, IL 9.5 FG - 12 Ton Concrete Structures - 28.3 Cu Yd Precast Concrete Bridge Slab - 1201 Sq Ft Reinforcement Bars, Epoxy Coated - 6210 Pound Steel Railing, Type SM - 85 Foot Driving Piles - 520 Foot Project Location: Waffler Road over Spanker Branch, 0.38 miles north of Lee Road Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal of an Existing Single-span Structure and Constructing a New Single-Span Precast Deck Beam Bridge

Post-Bid

Bridges / Tunnels

$10,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

20

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
41
Bidding Soon
769
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

February 3, 2025

img_map_placeholder

Waffler Rd, Sugar Creek Township, IL


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Removal of an Existing Single-span Structure and Constructing a New Single-Span Precast Deck Beam Bridge

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.