BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Renovation of a municipal facility in Fort Myers, Florida. Completed plans call for the renovation of a municipal facility.

**As of September 04, 2025, the project was awarded to Seagate Development Group but the awarded amount is not available.** Question Cut Off Date: 7/23/2025 05:00:00 PM (ET) Any inquiries, suggestions or requests concerning interpretation, clarification or additional information pertaining to the solicitation shall be submitted in writing prior to 5:00 PM at least eight (8) calendar days prior to the date when the submission is due. Lee County Board of County Commissioners seeks to contract with a qualified CONTRACTOR to provide for the purchase and installation of a 900kw Diesel generator with a 660-gallon double walled subbase tank and SAL2 Hurricane Rated Enclosure with decorative wrap, at the Melvin Morgan Constitutional Complex located at 2480 Thompson St., Floor Fort Myers, FL 33901. RESPONSBILITIES OF THE CONTRACTOR:CONTRACTOR shall furnish all labor, material, tools, equipment, supplies, services and other means necessary or proper for performing and completing the project. The CONTRACTOR shall be fully responsible for the coordination of their work and the work of their employees, subcontractors, and suppliers with the COUNTY and regulatory agencies, and assure compliance with schedules. The CONTRACTOR shall maintain the work area and site in a clean and acceptable manner. The CONTRACTOR shall ensure the work does not disrupt the operations of the building during the normal business hours. Should a full or partial system shutdown be necessary during this project, the Contractor shall coordinate such shutdown as far in advance as possible with the Project Manager and receive written authorization for the shutdown at least 24 hours prior to the work commencing. The CONTRACTOR shall protect finished and unfinished work. 1.1.The CONTRACTOR shall complete the following work at the site as depicted on plans and described herein including, but not limited to: 1.1.1. Installation of new concrete equipment slabs. 1.1.2. Installation of new generator, ATS, MTS and all associated duct banks, conduits and other electrical equipment. 1.1.3. Installation of new traffic bollards. 1.1.4. Instrument and Controls. 1.1.5. Restoration of project site.

Award

Municipal

$50,000.00

Public - County

Renovation

16

12

4

5

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
89
Bidding Soon
1,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

2480 Thompson St, Fort Myers, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.