BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Urbana, Illinois. Completed plans call for the renovation of a municipal facility.

The County is soliciting proposals from qualified solar providers for a turn-key installation of a rooftop solar PV project at the listed site addresses. The goal of this RFP is to identify a qualified provider with the necessary experience to ensure a fully-managed and well-executed process. The successful Proposer will have demonstrated experience designing, planning, scheduling, permitting, constructing, interconnecting, and commissioning a solar PV system. Proposer is responsible for all permitting and licenses and should include the cost of all permitting in their proposal. Proposers should be familiar with Ameren regulations, provide project financial analysis, and have established on-site safety standards. The County reserves the right to modify the scope of the project at any time prior to contract execution. See Attachment A indicating available areas for installation. These drawings are meant for informational purposes only and must be field-verified by Proposer.The Proposer shall develop a design for new PV systems that provides best value to the County. 2.1. Design Guidelines Proposer should consider the following guidelines when designing the solar PV system. (1) Rooftop Solar It will be the responsibility of the Proposer to assess the building's structural integrity, roof condition, and shading limitations. o Mounting systems shall limit roof penetrations. Mounting system design needs to meet applicable local building code requirements with respect to snow and wind loading factors. o Solar system installation must not void the roof warranty. o Conduit penetrations shall be minimized. o All roof access points shall be securely locked at the end of each day during construction. o System layout shall meet local fire department, code and ordinance requirements for roof access. o The successful Proposer will be responsible for daily cleanup ensuring all affected areas of the building are left "broom clean" each day of construction. Question Deadline 12/09/2024 Please submit questions via email to solarRFP@naniaenergy.com Answers to RFP Questions Distributed December 11, 2024 County Board Review & Award February 20, 2025

Sub-Bidding

Municipal

$1,150,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
52
Bidding Soon
475
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

February 21, 2025

img_map_placeholder

1605 E Main St, Urbana, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.