Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work for a water / sewer project in Florence, Oregon. Completed plans call for site work for a water / sewer project.

performing the construction of Well 14 according to the Drawings and Project Manual including Specifications prepared by GSI Water Solutions, Inc. accepted by the City and described in general as: Water Supply Well 14 and groundwater well drilling, construction and testing. This work is for construction of a groundwater monitoring well (2-inch) with a drill borehole of 6-inches; municipal water supply well with a drill borehole of 20-inches 155 foot deep, with 100 feet of 16-inch permanent casing and 55 feet of 16-inch stainless steel well screen. The work includes well capacity testing, video survey of completed well, and a sanitary seal on top of the well casing upon completion of the work. Questions regarding the type of work required may be addressed to Matt Kohlbecker at mkohlbecker@gsiws.com. Only emailed inquiries will be accepted. Mike Miller, Public Works Director, shall be copied on emailed inquiries at mike.miller@ci.florence.or.us All proposals must be submitted on the regular forms furnished and shall be accompanied by an unconditional certified check or bidder's bond in an amount equivalent to five (5) percent of the total amount of the bid. The award will be made to the lowest qualified bidder who will be asked to furnish a separate 100% Corporate Surety Performance Bond and a Separate 100% Payment Bond for the faithful performance of the contract. The Contractor's may be asked to have their Surety furnish a letter certifying they have currently reviewed the Contractor's financial statement and that the Contractor is financially sound prior to award. Subcontractor declarations must be submitted to the above mentioned City representative no later than 4:00 p.m. local time December 19, 2024. The City reserves the right to reject any Contractor who has not performed acceptably on past projects with the City and may reject any Contractor that does not meet the standards required under ORS 279C.375. This contract is for public work and is subject to ORS 279C.800 to 279C.870. Prevailing wage rates for public works' contracts in Oregon are required for this project. No bid will be received or considered by the Owner unless the bid contains: 1) a statement that bidder will comply with the provisions of ORS 279C.840 2) a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120. All questions should be directed to: Project Engineer: Matt Kohlbecker – mkohlbecker@gsiws.com CC: Mike Miller – mike.miller@ci.florence.or.us

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

4

12

4

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
27
Bidding Soon
272
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

March 10, 2025

Project location map

To Be Determined, Florence, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.