BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work and paving for a road / highway in Salt Lake City, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Description : High Volume County: Salt Lake All of the Structures Plans Are for Information Only. An Addendum of Approved Structures Plans Will Be Forthcoming During the Advertising Period of the Project. This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. Electronic Mbdc Files/models Provided on Contractor Zone. The Department Will Not Hold Retention on This Project. Per Utah State Code 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code 13-8-5 (1) for More Information. DBE Goal:5.00% Wage Rates: Apply Engineer's Estimate: Greater than $150M but less than or equal $200M Mandatory Prequalification Required (Qualified Health Insurance Required) Each Bidder Must Submit an Electronic Bid Bond From an Approved Surety Company Through the Appropriate Clearinghouse, as Defined in the Udot E-bidding Guide, Using Udot's Bidding Business System or in Lieu Thereof, Cash, Certified Check, or Cashier's Check for Not Less Than 5% of the Total Amount of the Bid, Made Payable to the Utah Department of Transportation, Showing Evidence of Good Faith and a Guarantee That if Awarded the Contract, the Bidder Will Execute the Contract and Furnish the Contract Bonds as Required. The Right to Reject Any or All Bids is Reserved. As required, a contractor's license must be obtained from the Utah Department of Commerce to work on UDOT projects as defined from the Division of Professional Licensing. Prequalification of bidders is required. Prior to submitting a bid, the bidder must have on file with the Utah Department of Transportation a completed and approved contractor's application for prequalification. Department processing time is 20 working days from receipt of properly executed documentation. Project Plans Cannot Be Downloaded or Printed From the Website Unless Your Company is Registered With Udot. Go to Udot's Website to Register. UTDOT - High Volume (I-215; SR-201 to North Temple) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Under Construction

Roads / Highways

$114,101,513.00

Public - State/Provincial

Paving, Site Work

2018

12

18

9

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
108
Bidding Soon
966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 28, 2025

Project location map

I-215, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.