Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 27, 2024 at 7:00 PM
Updated November 28, 2024
This is a service / maintenance or supply contract in Albany, New York. Contact the soliciting agency for additional information.
Single Exit Study The DOS's objectives for the consultant for this study include, but are not limited to: 1. Evaluate current building code requirements for multi-unit residential buildings above three stories, up to at least six stories. 2. Examine current building codes that allow for single-exit, single stairway multi-unit residential buildings above three stories, up to at least six stories, including but not limited to the City of New York. 3. Evaluate the feasibility of the design and installation of a single-exit in multi-unit residential new buildings. 4. Evaluate the technical criteria for single-exit buildings, including design features, mitigating factors, fire hazards, fire incident data, code requirements, alternatives, and restrictions including added features to reduce fire risk. 5. Estimate the potential cost savings of installing a single-exit building (including any proposed mitigating provisions) compared to current code requirements. 6. Examine any current or future code change proposals to the 2027 model building codes (including state and local governments) for single-exit, single stairway multi-unit residential buildings above three stories, up to at least six stories. 7. Assessment of impact(s) for single-exit buildings on local fire department response, capabilities, operations, and tactics. If appropriate, draft potential code provisions for consideration by the Code Council for incorporation of building codes for single-exit, single stairway multi-unit residential buildings above three stories, up to six stories, including any additional mitigating requirements to ensure the health, safety, and security of building occupants and first responders. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: Two Years The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2025
Multiple Locations, Albany, NY
Related To This Project
Albany, NY
Bid Date: Dec 06 2024
Albany, NY
Bid Date: Dec 06 2024
Albany, NY
Bid Date: Dec 23 2024
Albany, NY
Bid Date: Feb 28 2025
Albany, NY
Bid Date: Dec 05 2024
Albany, NY
Bid Date: Jan 14 2025
Albany, NY
Bid Date: Jan 24 2025
Albany, NY
Bid Date: Jan 24 2025
Albany, NY
Bid Date: Jan 24 2025
Albany, NY
--
Albany, NY
Bid Date: Mar 20 2025
Albany, NY
--
Albany, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
