Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Site work for a civil project in Indiantown, Florida. Completed plans call for site work for a water / sewer project.
As of November 21, 2025, the general contractor has been selected, construction commenced in February 2025, and substantial completion is targeted for December 31, 2026. *The closed solicitation has been included below for reference: The Village of Indiantown, Florida, announces that professional services will be required related to the Districts Wastewater Treatment Facility Injection Well System Improvements Project (Project) authorized by Chapter 190, Florida Statutes. The firm selected will act in the general capacity of Project Consultant and will provide all professional services related to the Project, including but not limited to permit compliance and reporting; construction management, inspection, administration and oversight; and all other professional services as required by the Project. The District previously selected a contractor to construct the Project pursuant to that certain Request for Proposals for Wastewater Treatment Facility Injection Well System Improvements Project dated October 2024, as amended by Addendums No. 1 and 2 (Construction Project Manual). Please refer to the Construction Project Manual for additional details on the Project. The construction and permitting must conform to the Florida Department of Environmental Protection (FDEP) Underground Injection Control Construction and Testing Permitting and with Florida Administrative Codes 62-4, 62-520, 62-522, 62-528, 62-550 and 62-660. The District anticipates FDEPs issuance of a draft construction and testing permit by December 2024. Any firm or individual (Applicant) desiring to provide professional services to the District must: 1) hold applicable federal, state and local licenses; 2) be authorized to do business in Florida in accordance with Florida law; and 3) furnish a statement (Qualification Statement) of its qualifications and past experience on U.S. General Service Administrations Architect-Engineer Qualifications, Standard Form No. 330, with pertinent supporting data. Among other things, Applicants must submit information relating to: a) the ability and adequacy of the Applicants professional personnel; b) whether the Applicant is a certified minority business enterprise; c) the Applicants willingness to meet time and budget requirements; d) the Applicants past experience and performance, including but not limited to past experience for any community development districts and past experience with the Village of Indiantown; e) the geographic location of the Applicants headquarters and offices; f) the current and projected workloads of the Applicant; and g) the volume of work previously awarded to the Applicant by the District. Further, each Applicant must identify the specific individual affiliated with the Applicant who would be handling District meetings, construction services, and other tasks. The District will review all Applicants and will comply with Florida law, including the Consultants Competitive Negotiations Act, Chapter 287, Florida Statutes (CCNA). The Board shall select and rank the Applicants using the requirements set forth in the CCNA and the evaluation criteria on file with the District Manager, and the highest ranked Applicant will be requested to enter into contract negotiations. If an agreement cannot be reached between the District and the highest ranked Applicant, negotiations will cease and begin with the next highest ranked Applicant, and if these negotiations are unsuccessful, will continue to the third highest ranked Applicant The District reserves the right to reject any and all Qualification Statements. Additionally, there is no express or implied obligation for the District to reimburse Applicants for any expenses associated with the preparation and submittal of the Qualification Statements in response to this request. Any protest regarding the terms of this Notice, or the evaluation criteria on file with the District Manager, must be filed in writing, within seventy-two (72) hours (excluding weekends) after the publication of this Notice. The formal protest setting forth with particularity the facts and law upon which the protest is based shall be filed within seven (7) calendar days after the initial notice of protest was filed. Failure to timely file a notice of protest or failure to timely file a formal written protest shall constitute a waiver of any right to object or protest with respect to aforesaid Notice or evaluation criteria provisions. Any person who files a notice of protest shall provide to the District, simultaneous with the filing of the notice, a protest bond with a responsible surety to be approved by the District and in the amount of Ten Thousand Dollars ($10,000.00).
Under Construction
Water / Sewer
$20,506,829.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2025
To Be Determined, Indiantown, FL
Related To This Project
Indiantown, FL
Bid Date: Jan 09 2026
Indiantown, FL
Bid Date: Jan 09 2026
Indiantown, FL
Bid Date: Jan 09 2026
Indiantown, FL
--
Indiantown, FL
--
Indiantown, FL
Bid Date: Mar 10 2026
Indiantown, FL
Bid Date: Dec 05 2025
Indiantown, FL
Bid Date: Dec 05 2025
Indiantown, FL
--
Indiantown, FL
--
Indiantown, FL
Bid Date: Oct 09 2025
Indiantown, FL
Bid Date: Nov 17 2025
Indiantown, FL
Bid Date: Sep 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
