BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Newport News, Virginia. Contact the soliciting agency for additional information.

The purpose of this Request for Quotes (RFQ) is to solicit quotes to furnish/provide Rolling Double Disc Seated Gate Valve, J&S Valve Model #7808, or approved equal. Any approved equal must receive prior approval from the Waterworks Department before the award. Specifications for the approved equal should be submitted along with the quote. Question Submission Deadline:November 27, 2024, 11:00am Questions regarding this Request for Quotes (RFQ) must be submitted in writing through electronically. 2: Contractor is responsible for delivering the gate valves to the designated location within the City of Newport News, VA. The values shall be properly packaged and protected to prevent any damage. 3. The required items shall be delivered within 30 days from the date of purchase order issuance. Award Award will be made to the lowest responsive and responsible Bidder (reference Method of Award provision contained herein). The ability, capacity, skill, character, integrity, reputation, judgement, experience, efficiency, ability to perform within the time specified, quality of performance of previous contracts, financial resources, suitability of goods or services to particular purpose and future maintenance and service and any exceptions noted will be taken into consideration in making an award. The City may request additional information and make reasonable investigations as deemed proper and necessary to determine the ability of the bidder to perform the services/furnish the goods and the bidder shall provide the City information and data for this purpose. The City may inspect physical facilities if deemed necessary. The results of investigations and inspections may result in rejection of the quote. In addition, the City reserves the right to conduct any test/inspection deemed necessary to assure goods and services conform to the specifications. The City reserves the right to reject any quote in whole or in part and to delete items before making an award when the City determines that any of the quote prices are significantly unbalanced to the potential detriment of the City and for other reasons when in the City's best interest. The City reserves the right to waive any informality if it is determined to be in the best interest of the City. In the event of an error or inconsistency between the unit price(s) and the extension of prices, the unit price(s) shall govern. If the quote from the lowest responsive and responsible Bidder exceeds available funds, the Purchasing Agent or designee may negotiate with the apparent low Bidder to obtain a contract price within available funds. A Bidder may protest the award or decision to award by submitting such protest in writing to the Purchasing Agent no later than ten (10) days after the award or the announcement of the decision to award as indicated in the Code of the City of Newport News Section 2-576.3. No protest shall lie for a claim that the selected Bidder is not a responsible Bidder. The written protest shall include the basis for the protest and the relief sought. The Purchasing Agent shall issue a decision in writing within ten (10) business days stating the reasons for the action taken. This decision shall be final unless the Bidder appeals within ten (10) days of the written decision by invoking the administrative procedures established by the Purchasing Agent. 3.4. Termination for Cause In the event that the Contractor shall for any reason or through any cause be in default of the terms, conditions, or obligations of the contract documents, the City may give the Contractor written notice of such default and terminate the contract. All terms, conditions, and obligations of the contract documents are considered material. The City may, in its discretion, provide the Contractor an opportunity to cure the default, if curable, prior to termination. Unless a different duration is provided in the notice of default, or agreed upon by the parties in writing, the Contractor shall have fourteen (14) calendar days to cure the default from the date such notice is mailed to the Contractor unless notification is by facsimile or personal delivery, in which case the opportunity to cure shall commence upon delivery of the notice. Upon failure of the Contractor to cure the default, the City may immediately terminate the contract effective as of the mailing or delivery of the default notice. If the City terminates the contract, the Contractor shall remain liable for performance of all terms, conditions, and obligations through the date of termination. Termination by the City shall not constitute a waiver by the City of any other rights or remedies available to the City by law or contract. In addition, failure of the Contractor to perform the obligations of the contract may result in debarment of the Contractor for a period of up to three years. Termination and/or debarment of the Contractor shall not constitute a waiver by the City of any other rights or remedies available to the City by law or contract. 3.5. Force Majeure If the parties are unable to perform or are delayed in the performance of its obligations due to acts of God, natural weather disasters, fire, explosion, flood, war, civil disturbance, terrorism, or any other cause which is not reasonably foreseeable and which is beyond that Contractor's control, then provided that Contractor shall have delivered written notice to the City of the cause of the nonperformance within five (5) business days of the initiation of the delay, then such nonperformance shall not be an event of default under a contract resulting from this solicitation and the performance shall be resumed at the earliest practicable time after cessation of such interruption. If notice is provided within the manner and timeframe set forth herein, the time for performance of the obligations hereunder shall be extended for the period of the forced delay. 3.6. Independent Contractor The Contractor and any employees, agents, or other persons or entities acting on behalf of the Contractor shall act in an independent capacity and not as officers, employees, or agents of the City.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
27
Bidding Soon
636
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

January 2, 2025

img_map_placeholder

Multiple Locations, Newport News, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.