BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Site work and renovation of a detention facility in San Antonio, Texas. Working plans call for the renovation of a detention facility; and for site work for a detention facility.

**As of March 14, 2025, project has been canceled. As of this time it is unknown if an when project will rebid. Bexar County Facilities Management (BCFM) is seeking bids from contractors to replace and cap off the existing abandon piping, furnish and install new hydronic piping that will serve the Bexar County Krier Center. Three alternates are to replace three (3) boilers and add a water softener. Q And A Open11/25/2024 8:01:00 PM Q And A Close12/17/2024 1:30:00 AM Electronic submission via the Supplier Portal, Question tab The property is located: 3621 Farm Rd., San Antonio Texas, 78223 The second alternate is to furnish, replace and install three (3) new boilers that serve the entire campus. There are two options available for this alternate; Option 1 is to replace the existing boilers with gas boilers, Option 2 is to replace the existing boilers with condensing boilers. Contractor responsible for making final utility connections, testing, inspections and start-up for all new equipment. The scope consists of selective demolition and involves, but is not limited to, the following site utilities, minor landscaping, site trench work, joint sealant, flashing/sheet metal, plumbing and electrical systems, among others. Bexar County Facilities Management (BCFM) is seeking bids from contractors to replace existing hydronic piping, three (3) boilers, including adding a water softener to protect new equipment for Bexar County Krier Center, located at 3621 Farm Road, San Antonio, TX 78223. The new equipment to closely matches the existing boiler sizes, weight and capacity. Refer to scope of work and attachments for additional information, more detailed information. The contractor is responsible for the field verifying any measurements, sizes and quantities prior to bidding and starting construction. Scope of work is expected to be completed in single phases. The contractor may propose multiple phasing for County to consider so that one boiler is being replaced while others are in operation. After award of contract, the Contractor will be required to submit a detailed schedule of work plan for the completion of the project. If applicable, plan must include phasing of each major part of the project.

Final Planning

Jails / Prisons

$284,832.00

Public - County

Renovation, Site Work

5

5

2

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
122
Bidding Soon
1,977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2025

September 15, 2025

Project location map

3621 Farm Rd, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.