Site work for a water / sewer project in Hamilton, Ontario. Completed plans call for site work for a water / sewer project.

Only bid submissions received from prequalified Applicants as a result of this Request for Prequalifications will be considered for this Project. Any bid submission received from any other party, will be considered irregular and void. The scope of work consists of but is not limited to the following: General: - Working on a live municipal water system (one reservoir cell will be in operation while the other cell is worked on); - -Drainage of reservoir to sanitary sewer adjacent to the reservoir (per RFT contract document requirements); - Collection and treatment of water drained from reservoir. The water is to be treated to separate and collect the solid materials from the water, with the remainder being treated to the standards required to comply with the City of Hamilton's Sanitary Sewer Use By-law. The Contractor will be responsible for testing the water on a regular basis to ensure compliance with the by-law. Coating material removed from inside the reservoir(separated/collected as part of the treatment process) is to be disposed of by the Contractor, following all legal requirements (e.g., transportation, storage, disposal, tracking, approvals); - Preserve, protect and prevent to the extent possible any and all damage to trees adjacent to the work. Discharging the treated water removed from the reservoir will require the Contractor to supply and install a temporary pipe through a heavily wooded area from the reservoir to nearest sanitary manhole (as per RFT documents); - Removal of coatings within both cells (upon confirmation and direction by the Consultant after both cells have been drained); - Concrete / joint repair / crack injection in areas identified by the Consultant within the reservoir; - Application of a protective coating, appropriate for a water environment, on walls, floors of the reservoir, and on columns identified by the Consultant; - Disinfection of both reservoir cells as for the City of Hamilton disinfection requirement sand protocols as prescribed in the RFT documents; - Ensure safe operation and staging of all work activities, equipment, and machinery operation in the vicinity of the trail, and reservoir interior / exterior; - Cleanup and reservoir ventilation if required; and - Restoration, grading, and landscaping for any damage made under the contract during Construction. The value of this project is estimated to be between $2M and $3M. Documents can be obtained at: https://hamilton.bidsandtenders.ca Question Deadline: Tue Dec 31, 2024 11:59:00 PM (EST) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$3,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
128
Bidding Soon
2,439
All Active Projects
994
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

March 3, 2025

img_map_placeholder

300 Beddoe Dr, Hamilton, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.