BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated February 6, 2025

Demolition, site work and asbestos abatement for a residential development in Mobile, Alabama. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Scope of Work: Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. The Contractor shall deliver the Work complete within thirty (30) calendar days from the date of the written Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Around $2,500 to 3,500. REMOVE DAMAGED WOOD FRAME STRUCTURES 2. FIELD VERIFY ALL SITE CONDITIONS 3. REMOVE CMU/BRICK PIERS AND OR CONCRETE SLAB(S) FIELD VERIFY 4. REMOVE ALL TIRES, TRASH, ROOF REMNANTS, GARBAGE, ETC. OFF SITE 5. ALUMINUM FENCE SHALL REMAIN 6. REMOVE ALL VINES, BUSHES, SHRUBS ALONG THE ENTIRE PERIMETER AND CUT TREES WITH A CALIPER OF 8" OR LESS 4" ABOVE GRADE WITHIN THE PROPERTY LINES/FENCE LINE. 7. CLEAR ENTIRE LOT, REMOVE ALL TRASH/GARBAGE, CUT ALL GRASS/WEEDS UP TO PROPERTY LINES. 8. CONTRACTOR SHALL FILL ALL VOIDS OF DISTURBED AREAS PER SECTION 02100 DEMOLITIONS BY WET METHOD AND SECTION 02100 SEEDING. 9. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES. (FULL PROTECTION OF STATE WATER-DOG RIVER WATERSHED) 10. CAP ALL SEWAGE LINES AT THE CURB: NOTIFY MUNICIPAL ENFORCEMENT DEPARTMENT WHEN SEWAGE LINE IS CAPED. 11. BEFORE AND AFTER PHOTOS ARE REQUIRED WITH PAY REQUEST.

Bid Results

Residential Subdivision

$3,800.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
29
Bidding Soon
770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 3, 2025

Project location map

1009 S Washington Ave, Mobile, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.