BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Sparland, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work on this project consists of the removal of Existing Structure No. 062-0008 originally built in 1948 as a single-span, cast-in-place re-enforced concrete T-beam superstructure supported by closed abutments on pile supported footings. The Proposed Structure No. 062-0074 is a 59'-6" back-to-back abutments single-span 27" PCC IL-Beam with concrete deck on integral abutments. The proposed bridge will be constructed under staged construction with traffic controlled by temporary bridge traffic signals. Additional construction includes installation of rip rap in the channel, PCC approach slabs and PCC connector pavement, reconstruction of the existing frontage road, guardrail installation, pavement resurfacing, restoration as needed, and all related collateral work necessary to complete the project. Bridge replacement of SN 062-0008 with SN 062-0074 carrying IL 29 over Barrville Creek, two miles south of Sparland in Marshall County. JOB NO. 192-1373 VBP % 0.00 Region 3 District 4 Federal Project # NHPPZT6B(681) County(s) Marshall Key Route(s) FAP 318 Marked Route(s) IL-29 Questions not accepted as of February 17, 2026 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 06, 2026. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 024 - Bridge Replacement - IL 29

Bid Results

Bridges / Tunnels

$1,706,806.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

77

8

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
251
Bidding Soon
2,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

April 28, 2026

Project location map

IL-29, Sparland, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.