Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 19, 2026 at 7:00 PM
Updated November 25, 2026
Site work and paving for a civil project in Cascade Locks, Oregon. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Region 1 I-84 (Westbound): Union Pacific Railroad Bridge (Hood River) Columbia River Kathryn Hoffberg, Pe I-84 (Westbound): Union Pacific Railroad Bridge (Hood River) Project on the Columbia River Highway (Rt. No. I-84) in Hood River. FAP No. S002(245). (Over $ 30,000,000). Req. approx. 1,505 ft2 temp sign; 2 ea seq arrow; 4 ea PCMS; 1 ea rdr spd trailer; 150 hr flag; 150 hr flag sta light; 75 ea TCS; 40 hr pilot car; 330 hr tow truck; 12,798 ft temp stripe; 2 ea temp br connect; 6,850 ft temp barr; 7 ea temp impact atten; 1,261 ea reflect barr panel; 15 day mobile barr; temp water mngt facility; 2 day pump monitoring; 2,000 yd2 plastic sheet; 56,900 yd2 matting; 28,000 yd2 comp ero blanket; 37 ea check dam; 7 ea const entrance; 1 ea tire wash; 3 ea conc washout; 900 ft sed fence; 12 ea inlet protect; 5,100 ft sed barr; turbidity monitor; 1,068 ton comtam soil disp; 3,000 ft2 rem asbestos; asbestos sampling; PH monitor wells; abandon existing wells; active treatment system; const surv work; 318 ft rem pipe; 4,300 ft sawcut; 6 acre clear and grub; 27,500 yd3 gen exc; 3,335 yd3 stone emb; 70 yd2 geotext; 9,800 yd2 subg geotext; 97 yd3 riprap; design drawing; ISM work platform; precon mix design test program and demo program, soil-cement column; 30 yd3 rock/boulder exc; 70 ft steel casing; 1,503 ft vid inspect; 1,372 ft pipe; install pipe under RR; 26 ea conc structure; 350 ft drain curb; 2 ea conn to existing struct; 39 yd3 trench resurf; 10 ea exploratory exc; 630 ea RR flag; temp work br; temp access and contain; temp ratain wall; 80 yd2 drain geotext; 120 ft drain pipe; shor, crib, cofferd; 1,750 yd3 struct exc; 930 yd3 stuct backfill; 1,145 yd3 drill shaft conc; 1,022,889 lb reinf; 12 ea CSL test; 758 ft drill shaft exc; 1,743 yd3 struct conc; 3,322 yd2 surface texture; 1,102 yd2 architect treatment; 391 yd2 reinf conc br appr slab; 91 ft br appr sleep slab; 2,448,378 lb steel plate girder; 35 ea bearing device; 1,676 ft conduit sys; 187 ft strip seal; 1,676 ft conc rail; 9,850 ft2 MSE retain wall; prefab mod grav retain wall; 1,526 yd2 CPPR; 6,600 ton aggr base; 2,710 ton aggr shoulder; 7,494 ton ACP (443 ton PG70-22ER); 112 yd2 conc pvmt; 2,364 ft gr rl; 1 mile rumb strip; 7,000 ft pmvt marking durable; 92 fbm wood sign post; 2,160 lb sign supp; 232 ft2 sign; water quality swale; 5 acre weed cntrl; 8 acre seed; 4,255 ea plants; 10 ea boulder; 1,157 ft fence; 109 ft potable pipe. This project requires Railroad Insurance. Class of Work: Bridges and Structures The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 001 - I-84 (Westbound): Union Pacific Railroad Bridge (Hood River) For questions, contact: Kathryn Hoffberg, ODOT Resident Engineer (971-401-2849) Kathryn.HOFFBERG@odot.oregon.gov
GC Bidding
Bridges / Tunnels
$30,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2026
February 15, 2027
I-84, Cascade Locks, OR
Related To This Project
Cascade Locks, OR
Bid Date: Jul 28 2025
Cascade Locks, OR
Bid Date: Apr 14 2025
Cascade Locks, OR
Bid Date: May 01 2025
Cascade Locks, OR
--
Cascade Locks, OR
Bid Date: Aug 29 2025
Cascade Locks, OR
Bid Date: Nov 04 2021
Cascade Locks, OR
Bid Date: Oct 09 2025
Cascade Locks, OR
Bid Date: Mar 03 2026
Cascade Locks, OR
--
Cascade Locks, OR
Bid Date: Sep 16 2024
Cascade Locks, OR
Bid Date: Oct 02 2025
Cascade Locks, OR
Bid Date: May 06 2024
Cascade Locks, OR
Bid Date: Apr 08 2024
Cascade Locks, OR
Bid Date: Mar 13 2024
Cascade Locks, OR
Bid Date: Jun 24 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed