Published January 16, 2025 at 7:00 PM
Updated January 17, 2025
Site work for a water / sewer project in Warsaw, Indiana. Completed plans call for site work for a water / sewer project.
The base bid work shall consist of sanitary, combined, and storm sewer rehabilitation via the installation of cured-in-place pipe (CIPP) in approximately 4,490 LF of sewers ranging in size from 6-inches to 21-inches. The Mandatory Add Alternate Bid No. 1 work shall consist of CIPP installation in approximately 326 LF of 10-inch combined sewer. The Mandatory Add Alternate Bid No. 2 work shall consist of CIPP installation in approximately 308 LF of 8-inch sanitary sewer. The Mandatory Add Alternate Bid No. 3 work shall consist of CIPP installation in approximately 319 LF of 8-inch sanitary sewer. The Mandatory Add Alternate Bid No. 4 work shall consist of CIPP installation in approximately 503 LF of 6-inch to 12-inch storm sewer. The Mandatory Add Alternate Bid No. 5 work shall consist of CIPP installation in approximately 745 LF of 12-inch storm sewer. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. The Contractor to whom the work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. Questions should be submitted to jessiel@wesslerengineering.com no later than December 10, 2024 Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications.
Post-Bid
Water / Sewer
$800,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2024
January 15, 2025
Multiple Locations, Warsaw, IN
Related To This Project
Warsaw, IN
Bid Date: Apr 22 2025
Warsaw, IN
Bid Date: Apr 22 2025
Warsaw, IN
--
Warsaw, IN
Bid Date: Jun 05 2025
Warsaw, IN
Bid Date: Jul 09 2025
Warsaw, IN
Bid Date: Sep 07 2025
Warsaw, IN
Bid Date: Oct 06 2025
Warsaw, IN
Bid Date: Nov 24 2025
Warsaw, IN
--
Warsaw, IN
Bid Date: May 06 2025
Warsaw, IN
Bid Date: Nov 20 2024
Warsaw, IN
Bid Date: Oct 18 2024
Warsaw, IN
--
Warsaw, IN
Bid Date: Jul 10 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.