BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2025 at 7:00 PM

Updated January 11, 2025

Site work and paving for a road / highway in Springfield, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For the purpose of: Wheeler Avenue Improvements Bids will not be considered unless they are accompanied by bid security in the form of a certified check, cashiers check, bank draft, bank money order or a satisfactory bid bond in the sum of five percent (5%) of the base bid amount. The City reserves the right to accept or reject any or all proposals. Typical work shall consist of the removal of the existing pavement of Wheeler Ave between Cook Street and Adams Street with gaps at Jackson Avenue and Capitol Street; installation of aggregate base, asphalt binder, asphalt surface, and concrete valley gutter to provide a 20-24-ft wide traveled way; installation of PROWAG compliant curb ramps; with the necessary drainage improvements, drainage outlets, ditch grading and utility adjustments and incidental construction.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

143

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
65
Bidding Soon
1,054
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

Project location map

S Wheeler Ave, Springfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.