Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2025 at 7:00 PM
Updated February 1, 2025
Demolition, site work, new construction and renovation of a civil project in Greenville, Ohio. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; for the construction of a water / sewer project; and for the demolition of a water / sewer project.
1. The proposed solids handling improvements include: a. Three aerobic digesters. Some of the major process equipment includes submersible pumps one/tank), and coarse bubble diffuser systems (one/tank). b. Solids Handling Building with process, electrical and HVAC equipment. Some of the major process equipment include blowers, sludge storage day tank, two progressive cavity pumps, solids dewatering press, booster pumps and polymer system. c. Biosolids Storage Building with a shaftless screw conveyor system. d. The existing sludge holding tank, sludge pumping system, and digester will be demolished. The sludge storage lagoon and supernatant lagoon will be abandoned. The sludge force main from the WWTP to the lagoons will be abandoned in place. e. A new administration building will be built that will include a laboratory, office rooms, conference room, restrooms, locker rooms, and a garage. The old administration building will be left as is. Question Deadline 01/15/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Technical questions regarding the project should be e-mailed to the Project Manager Dinesh Kumar Palaniswamy; dpalaniswamy@jheng.com at Jones & Henry Engineers, Ltd. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 90 days after the actual opening thereof. The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner. Document Note: Copies of Bidding Documents and Contract Documents may be obtained electronically from online. There is no charge to download from the digital print-room, however, registration is required. If hard copies of the bidding documents are needed, they can be ordered from the print-room for a fee. If you have any problems using the digital print-room, you are encouraged to contact either the Engineer's Project Manager, or Eastern Engineering at 419-661-9841.
Post-Bid
Water / Sewer
$16,682,155.00
Public - City
Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2025
March 31, 2025
209 N Ohio St, Greenville, OH
Related To This Project
Greenville, OH
Bid Date: Feb 05 2025
Greenville, OH
Bid Date: Feb 28 2025
Greenville, OH
Bid Date: Mar 04 2025
Greenville, OH
Bid Date: Feb 14 2019
Greenville, OH
Bid Date: Mar 14 2019
Greenville, OH
--
Greenville, OH
Bid Date: Apr 04 2025
Greenville, OH
Bid Date: Mar 31 2025
Greenville, OH
Bid Date: Dec 12 2024
Greenville, OH
Bid Date: Oct 24 2024
Greenville, OH
--
Greenville, OH
--
Greenville, OH
--
Greenville, OH
Bid Date: Aug 06 2024
Greenville, OH
Bid Date: Aug 27 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
