BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2025 at 7:00 PM

Updated January 17, 2025

Site work for a water / sewer project in Charleston, West Virginia. Completed plans call for site work for a water / sewer project.

The West Virginia Department of Environmental Protection Office of Oil and Gas is soliciting bids to establish a contract for the Construction/Reclamation/Plugging Project in Marion County, WV on twenty-seven (27) wells collectively known as Marion Co. MultiWell Plugging Package. Question Deadline Dec 13, 2024 at 3:00 PM Pre-Bid Location Directions from the Charleston Area: Take I-79 N toward Clarksburg. Continue for 131 miles, and then take Exit 132 to merge onto US250 S. In 0.1 miles, turn right onto Middletown Rd. Proceed 0.9 miles, and then turn right onto Industrial Park Rd. Continue for 0.3 miles, and then turn left onto Manuel Dr. In 0.3 miles, continue onto Industrial Park Rd. In 384 feet, continue onto Manuel Dr. Proceed 0.7 miles, and then turn left onto Manley Chapel Rd. Continue for 1.2 miles, and then turn right onto Koons Run Rd. In 1.6 miles, turn left onto US-19 S. Proceed 0.4 miles, and turn right onto WV-218 N. Continue for 4.4 miles, and then turn left onto US-250 N. Proceed 4.2 miles, and then turn left onto Rainbow Plaza. Directions from the Parkersburg Area: Take US-50 E / Northwestern Turnpike. Follow for 70.2 miles, and then use the right lane to take the US-19 / WV-20 / W. Pike St. ramp. Continue 0.2 miles, and turn left onto US-19 N / WV-20 N / W. Pike St. Proceed 15 miles, and turn left onto WV-218 N. Continue for 4.4 miles, and then turn left onto US-250 N. Proceed 4.2 miles, and then turn left onto Rainbow Plaza. Pre-bid meet-up will begin in the Shop & Save parking area at Rainbow Plaza. Vendors are welcome to bring a side by side or ATV to reach some of the more difficult wells included in the pre-bid showing. Note: DEP strongly advises using only the provided turn-by-turn directions listed below to navigate to the pre-bid meeting site. Failure to arrive at the determined pre-bid location due to navigation errors will not warrant rescheduling another meeting. Per Addendum 2 the bid date has changed to December 26th, 2024.

Post-Bid

Water / Sewer

$205,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

36

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
38
Bidding Soon
801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 26, 2024

January 24, 2025

Project location map

Multiple Locations, Charleston, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.