Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 24, 2025 at 8:00 PM
Updated April 26, 2025
Demolition, site work, paving and new construction of a civil project in Marion, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
3.6 miles of roadway reconstruction including adding lanes, reconstruction of 4 bridges and intersection reconstruction on IL 13 from Spillway Road to Shawnee Trail. Region : 5 District : 9 Federal Project # N/A County(s) Williamson Key Route(s) FAP 331 Marked Route(s) : IL 13 Section(s) : (1-4)R-5,RS-2,B-1,B-2,B-3,B-4 State Job #(s) : C-99-045-13 PPS #(s) : 9-00475-1100 9-00475-1200 9-00475-2000 9-00475-2100 9-01028-0000 VBP % 0.00 DBE % 0.00 Contract Specifics Completion Date: August 01, 2028 Plus 10 Working Days Questions not accepted as of April 15, 2025 04:30 PM Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 04, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 136 - Roadway Reconstruction Including Adding Lanes, Reconstruction of 4 Bridges and Intersection Reconstruction on IL 13 The project involves pavement widening, HMA resurfacing, constructing a multiuse path, bridge replacement of four structures, intersection improvements, drainage improvements, ADA improvements, and signal installation.
Post-Bid
Bridges / Tunnels
$5,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
June 24, 2025
IL-13, Marion, IL
Related To This Project
Marion, IL
Bid Date: Apr 25 2025
Marion, IL
Bid Date: Apr 25 2025
Marion, IL
Bid Date: Mar 30 2025
Marion, IL
--
Marion, IL
Bid Date: Jun 13 2025
Marion, IL
Bid Date: Aug 01 2025
Marion, IL
Bid Date: Jun 13 2025
Marion, IL
Bid Date: Jun 13 2025
Marion, IL
Bid Date: Mar 21 2025
Marion, IL
Bid Date: Mar 19 2025
Marion, IL
Bid Date: Feb 13 2025
Marion, IL
--
Marion, IL
Bid Date: Jan 14 2025
Marion, IL
Bid Date: Jan 14 2025
Marion, IL
Bid Date: Jan 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
