Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 15, 2025 at 7:00 PM

Updated January 18, 2025

Demolition, site work, paving and new construction of a mixed-use development in Killingworth, Connecticut. Completed plans call for site work for a playground / park / athletic field; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of the locally iconic Chatfield Hollow State Park Covered Bridge. Project includes but is not limited to demolition of existing abutments and pier. cofferdam installation. installation of new cast-in-olace concrete abutments. installation of new superstructure including steel stringers with timber decking and wall and roof sections which are modeled after the pre-existing bridge's, general site improvements and rock weir installation. Contract to be awarded on or about January 23rd, 2025 with a start date on or about February 6th, 2025. Bidders must be Certified Set-aside Contractors if their bid is $500,000 or below Bidders must be DAS-Prequalified Contractors if their bid exceeds $500,000. Completion Time Allowed: Two Hundred and Seventy (270) Calendar Days. Liquidated Damages: One Thousand Dollars ($1000.00) per calendar day. Question Deadline 01/10/2025 at 4:00 PM ET

Post-Bid

Bridges / Tunnels

$627,125.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

16

19

4

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,075
Active Projects
365
Bidding Soon
7,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

February 6, 2025

Project location map

381 Rte 80, Killingworth, CT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed