BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work and paving for a road / highway in Mount Vernon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits. Region 5 District 9 Federal Project # N/A County(s): Jefferson Key Route(s) : FAP 821 Marked Route(s) : IL 15 Section(s) : (11,12,13)RS-4 State Job #(s) : C-99-098-24 PPS #(s) : 9-00748-0000 DBE % 8.00 VBP% 0.00 Contract Specifics 35 Working Days LOCATION OF PROJECT This project is located on IL15 in Jefferson County. The project begins at Washington Co line and proceeds west 9.19 miles along IL 15 to 0.4 miles west of Mt. Vernon West City Limits. DESCRIPTION OF PROJECT The proposed project is 9.16 miles long. The proposed work consists of pavement patching, 1 1/2 " HMA surface removal, and 1 1/2 " HMA surface course. This proposed project will include shoulder work, pavement marking, and raised pavement markers. This is an experimental project to determine if current 90 gyration (N90) HMA mixtures can be successfully replaced with 70 gyration (N70) HMA mixtures utilizing the current N90 fine aggregate requirements. The experimental N70 surface mixture shall be placed in the eastbound lane and the N90 surface mixture shall be placed in the westbound lane and serve as the control section. Questions not accepted as of June 03, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, May 23, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 144 - Patching and Resurfacing on IL 15

Award

Roads / Highways

$2,283,905.00

Public - State/Provincial

Paving, Site Work

35

8

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
63
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

August 12, 2025

Project location map

IL-15, Mount Vernon, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.