BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2025 at 7:00 PM

Updated February 4, 2025

Renovation of a municipal facility in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility.

Est. Value: $ 216,600.00 Est. Completion Date: May 2, 2025 Responders must attend the pre-bid meeting prior to submitting their response. Responses received from responders that did not attend the pre-bid meeting will be rejected. NOTE, attendees must register in advance to attend the pre-bid meeting. The deadline to register is 5:00 PM CT on Wednesday December 11, 2024. To register email Timothy Struss at timothy.struss@state.mn.us with the full legal name of all attendees and the organization they represent in the body of the email. This solicitation is Targeted Group (TG), Economically Disadvantaged (ED), or Veteran-Owned Small Businesses (TG/ED/VO) preference. A. The work will be done under one prime contract that includes: General construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) MCF-Willow River: Remove existing failed resinous flooring and wall base in showers, toilet rooms, and custodial areas, prepare surfaces to receive new finishes, and install new resinous surfacing on floors and wall base. Work area is approximately 2,100 sf. 2.) MCF-Rush City: Remove existing failed resinous flooring, concrete floor slab and custom stainless steel floor sink in the kitchen area. Facility to perform plumbing repairs at the area of removed concrete prior to contractor proceeding with restoration work. Contractor to verify preparation of subgrade, install vapor retarder and reinforcing, and install new structural concrete floor. New concrete to be properly cured and prepared to receive new resinous flooring. Install new resinous flooring and cove wall base. Work area is approximately 500 sf. Responding company has completed as a Prime Contractor or as a subcontractor, the work for at least three (3) contracts which have achieved Substantial Completion since October 1, 2019 for construction of General Contracting that involved a similar project scope. Each of these contracts MUST have had a construction value of $100,000 or greater. Question Deadline 12/19/2024 at 12:00 PM CT Please contact MDHR with questions at: 651-539-1095 (metro), 1-800-657-3704 (toll free), 711 or 1-800-627-3529 (MN Relay) or at compliance.MDHR@state.mn.us

Award

Municipal

$221,500.00

Public - State/Provincial

Renovation

7

11

2

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
147
Bidding Soon
1,425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 20, 2025

Project location map

Multiple Locations, Saint Paul, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.