BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2025 at 7:00 PM

Updated May 6, 2025

Renovation of a medical facility in Las Vegas, Nevada. Working plans call for the renovation of a medical facility.

**As of January 10, 2025 project has been canceled. As of this time it is unknown if an when project will rebid. Deferred Maintenance (Stein) - Fire Alarm Panel and Devices Description: Base Bid Description: Replace fire panel and devices (E0.00, E11.1 keynotes 1, 4, and 22, FA1.01, FA1.02). Contract Time: 90 calendar days. Liquidated Damages: $560.00 per day. Prevailing Wages must be paid on this project. Site Address: 6161 West Charleston Blvd., Building 3 Est. Value: $ 406,000.00 Site Directions: 6161 West Charleston Boulevard, Building 3, Las Vegas, Nevada 89146

Final Planning

Medical

$406,000.00

Public - State/Provincial

Renovation

60

25

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
31
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

July 17, 2025

Project location map

6161 W Charleston Blvd, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.