BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Site work for a water / sewer project in Baldwin Park, California. Completed plans call for site work for a water / sewer project.

The project will rehabilitate approximately 19,630 feet of existing corroded 15- to 30-inch diameter non-reinforced concrete pipe (NRCP), reinforced concrete pipe (RCP), and cracked vitrified clay pipe (VCP) on the Cameron Relief Trunk Sewer, Joint Outfall B - Unit 6H, Joint Outfall B - Unit 6J, and Joint Outfall H - Unit 8J Trunk Sewer with cured-in-place pipe liner. The project will also rehabilitate 69 manholes with a protective coating system and all appurtenant work. For technical questions concerning the project, plans, and specifications, contact Mathew Watson at mathewwatson@lacsd.org. The Board of Directors may award the contract for the above described work, either at the meeting of the Board of Directors to be held at the above-stated address, on February 12, 2025, beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 120 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 280 WORKING DAYS after the date in the Notice to Proceed. Est. Value Notes: $6,400,000 - $9,600,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$6,339,259.00

Public - County

Site Work

62

6

12

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
3
Bidding Soon
2,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

March 31, 2025

Project location map

Multiple Locations, Baldwin Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.