Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 9, 2025 at 7:00 PM
Updated January 15, 2025
This is a service / maintenance or supply contract in Elora, Ontario. Contact the soliciting agency for additional information.
The Township of Centre Wellington (the Township) is seeking to establish a Qualified Vendor Roster (QVR) to provide electrical contractor services at various Township facilities as further described in Section 4 - Deliverables. The QVR will be broken down into two categories. Category A - Commercial/Institutional Category B - Industrial (Water & Wastewater Treatment Plants) This prequalification applies to various electrical projects including electrical repairs and maintenance. The following are representative of the services which may be required. This is not an all-inclusive list. Other types of repairs and electrical services may be required: repair or replacement of various lighting equipment and controls repair or replacement of distribution wiring repair or replacement of existing electrical wiring repair or replacement of starters and various switchgear repair or replacement of various relays and control components troubleshooting and tracing electrical circuitry fault locating repair of underground faults repair or replacement of primary and secondary conductors and related equipment repair or replacement of panel boards connection and disconnecting of various equipment as required repair and troubleshoot instrumentation and maintenance of control systems inspect and test operation of instruments and systems to diagnose faults using electrical and electronic testing devices and precision measuring instruments perform installation of process control instrumentation such as transmitters, controllers, analyzers and control valves calibrate and replace components and instruments according to manufacturers' specifications perform scheduled preventive maintenance work and complete test and maintenance reports read and interpret instruction manuals, blueprints and control system drawings complete all written and electronic records (i.e. work orders, calibration sheets, material requests) required to document the work in progress and as it is completed comply with standards and procedures of the Occupational Health & Safety Regulations Question Deadline: Wed Dec 18, 2024 2:00:00 PM (EST) Duration in months: 36
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
February 13, 2025
Multiple Locations, Elora, ON
Related To This Project
Elora, ON
Bid Date: Mar 26 2025
Elora, ON
Bid Date: Mar 27 2025
Elora, ON
Bid Date: Apr 24 2025
Elora, ON
Bid Date: May 07 2025
Elora, ON
Bid Date: May 22 2025
Elora, ON
Bid Date: May 29 2025
Elora, ON
Bid Date: Jul 07 2025
Elora, ON
--
Elora, ON
Bid Date: Oct 23 2024
Elora, ON
Bid Date: Nov 01 2024
Elora, ON
Bid Date: Dec 17 2020
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
