BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated March 2, 2025

This is a service / maintenance or supply contract in Santa Ana, California. Contact the soliciting agency for additional information.

Water Treatment Chemicals & Related Services The County of Orange operates a Central Utility Facility (CUF) which produces Chilled Water, Steam and Electricity for the Santa Ana Downtown Civic Center. The plant consists of two gas turbines driving generators which generate 5.6 mw of power, the turbines exhaust into Heat Recovery Steam Generators which are capable of producing 65 mlbhr of 260 psig steam. The plant also consists of 6 chillers (4 Refrigeration and 2 absorption), a large cooling tower and Boiler Feed Water (BFW) treatment facility. The CUF is also charged with monitoring and water treatment responsibilities for several County Building Cooling Towers. On-call service requests involving repairs and/or alterations shall not exceed $60,000. Proposals deemed to meet all minimum RFP requirements will be scored based on the established criteria, and will be assigned points that measure the responsiveness to each identified criterion. The total number of points earned will be tallied for each Proposal, based upon the Respondent(s) submitted written materials. Protest of Award of Contract: In protests related to the award of a contract, the protest must be submitted no later than five (5) business days after the notice of intent award is provided by the DPA. Protests relating to a proposed contract award which are received after the five (5) business day deadline will not be considered by the County. Respondents must meet the minimum qualifications and requirements as set forth within the RFP and be capable of providing services identified in the Scope of Work herein. Question Deadline 12/09/2024 at 12:00 PM PT Question Submission Deadline online. Contractor Selection Date: Expected in approximately two weeks after Board Approval pre-proposal meeting notes Representatives arriving more than 10 minutes late (after 10:10 a.m.) will not be allowed to sign in and will be considered non-responsive. The pre-proposal meeting will establish the list of eligible firms to submit proposals and will provide an opportunity to address any questions about the RFP and the scope of services. No alternative meetings will be scheduled. The following locations will be visited during the pre-proposal meeting: First Location: Central Utility Facility, 525 N. Flower St, Santa Ana, CA 92703 Second Location: 1770 N. Broadway, Santa Ana, CA 92706 Third Location: 840 Eckhoff St, Orange, CA 92868. Respondents must acknowledge receipt of this RFP and confirm their intention to attend the pre-proposal meeting by email to LuisGallardo@ocpw no later than the end of the day on Monday, December 9, 2024. Upon the completion of the evaluation process, the Evaluation Committee will make a recommendation for an award to DPA. Final award determination shall be subject to reference checks and past performance and may be subject to approval(s) by the County Board of Supervisors. In addition, County reserves the right to verify and validate any information prior to the Contract Award and during the entire term of the Contract.

Award

Water / Sewer

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
11
Bidding Soon
2,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

Project location map

Multiple Locations, Santa Ana, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.