BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

Site work and paving for a mixed-use development in Southbridge, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of February 19, 2025 project is not yet been awarded. The Project consists of: replacement of concrete sonotube piers, wood deck and railings, pavement to the street and improvement of drainage under the deck toward a storm drain For Front Entry Deck and Walkway for 689-02 at 74 Litchfield Avenue, Southbridge. MA 01550, in accordance with the documents prepared by Roy S. Brown Architects. Bids shall be accompanied by a bid deposit that is not less than five (5%) ofthe total bid amount, and made payable to the Southbridge Housing Authority.

Bid Results

Sidewalks / Parking Lot

$59,000.00

Public - City

Paving, Site Work

12

17

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
258
Bidding Soon
4,885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

February 3, 2025

Project location map

74 Litchfield Ave, Southbridge, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.