BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Site work for a bridge / tunnel in Vandalia, Illinois. Completed plans call for site work for a bridge / tunnel.

Two individual County Bridge Embankment Stabilization Projects. Contractor prequalification with the Illinois Department of Transportation is required. The proposed work includes channel excavation as required to return the bridge opening to the original design conditions, placing riprap around and under the existing bridge at the abutments, placing controlled low-strength material at scoured areas under the abutment caps, and all miscellaneous work necessary to complete the proposed improvements.

Post-Bid

Bridges / Tunnels

$144,000.00

Public - County

Site Work

9

12

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
80
Bidding Soon
1,209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

Project location map

To Be Determined, Vandalia, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.