BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.

THE CONTRACT TIME IS 320 DAYS. ACE - West Valley Occupational Center - Communications Scope of work 2..1. Survey Contractor shall survey the site to: o Assess the general layout of the existing building infrastructure and pathways and resources for the purpose of scoping tasks necessary to complete a physical installation of the system. o Determine and identify the data cabinet locations, existing pathway and addition of new pathways to support new data cabinets and outlets. o Identify the most optimal paths to build new pathways to approximate cabinet and data outlet locations shown on the drawing. 2.2. Pathways Contractor shall: o Install new cabinets with electrical outlets, fans, thermostats with CAT90 locks/keys at locations per design. o Replace existing damaged cabinet locks with Cat90 locks/keys where applicable. Cat90 locks/keys shall be furnished by owner. o Install raceways, conduits, fittings, and pull boxes only as necessary to provide pathways for new cabling. Otherwise, use existing infrastructure as much as possible or a combination of both when practical. o Install as required new pathway to designated locations shown on the drawing o Provide size and quantity of cabinets for network equipment, enclosures for outdoor APs, conduits, raceways, and pull boxes as required o Note: Only Wiremold is approved for inside exposed pathway. All other exposed conduits shall be painted to match the existing wall. o Update drawing to show actual installation 2.3 Cabling Contractor shall: o Remove existing primary 62.5um fiber optic cabling and replace with LAUSD specification 27 1015 compliant 50um fiber optic cables per design o Install new secondary fiber optic cables per design o Install (N) Cat6 cables from (E) and (N)data cabinets to designated locations shown on the drawing. o (N)C6 cables shall not be terminated on (E)Cat5e panels. 2.3. Equipment Installation Contractor shall: o Rack and stack Wired LAN/ Wireless LAN equipment furnished by owner per design. Wall mount bracket shall be furnished by contractor. o Reuse existing patch cables where applicable. Provide new patch cables as needed. Contractor shall bill actual quantity. o Organize and dress fiber/copper patch cables using existing and new cable managers per design. Cable managers shall be furnished by contractor. 2.4 Equipment Configuration ITS shall: (per all applicable LAUSD Specifications) o Configure all owner-furnished LAN/WLAN equipment o Configure AirWave for new APs o Test and verify post cut over wired/wireless performance. 2.5 Additional Requirements Contractor shall: o Provide bills of materials for installation o Remove all abandoned data cabinet, equipment, and cables. o Maintain compliance with LAUSD specifications for hardware and premise cabling: o 27-1013 Structured Cabling (Existing Sites) o 27_1015_Premises_Wiring_for_Convergence_of_Communication_Systems o 27-1018 Local Area Network (LAN) Systems o 27_1017_Wireless_Local_Area_Network_(WLAN)_Systems

Sub-Bidding

Educational

$1,172,000.00

Public - County

Renovation

31

27

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
94
Bidding Soon
1,821
All Active Projects
646
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

January 20, 2025

img_map_placeholder

6200 Winnetka Ave, Los Angeles, CA

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.