Renovation of a mixed-use development in Coatesville, Pennsylvania. Completed plans call for the renovation of a educational facility.

sealed bids for the renovation of Scott Middle School at 800 Olive Street in Thorndale PA. This is a single scope of work and includes all work necessary for the construction of sidewalks, ramps, striping, casework replacement, flooring replacement, painting, gym floor refinishing, and any demolition necessary to complete the work. For technical project information or questions, please contact Ianni Vardouniotis at Ianni.vardouniotis@ics-builds.com. All questions and clarifications will be published via addenda.The last day to submit a question is by EOD December 27th. Bidders are responsible for any and all costs associated with the production of plans and specifications for their use. Work will begin after receipt of the signed contract from the Owner. The anticipated award date is January 28th 2025. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The onsite work will begin on the premises no later than April 21st 2025. Owner requires all work to be substantially complete by August 15, 2025. Bids must be accompanied by Bid security in the form of a certified check, cashier's check, or Bid bond in the amount of 10% of the base Bid submitted, made payable to the owner, as guarantee that Bidder will, if awarded, enter into contract in accordance with contract documents and submitted Bid. The School District is requesting bids to be made "net of insurance" (OCIP) and will award the contract to the lowest responsible bidder "net of insurance," all as more thoroughly described in the Contract Documents. Under this approach, Contractors and Subcontractors must remove the cost of Owner provided insurance from the Base Bid price. The lowest responsible bidder will be determined on a "net of insurance" basis. In other words, the Base Bid is to be identified by the Contractor excluding costs and expenses for General Liability, Umbrella/Excess Liability, Workers' Compensation, and Builder's Risk Insurance as delineated in the contract documents. Alternate Bids and Unit Prices are also to be set forth excluding cost for such insurance.

GC Bidding

Educational

$2,500,000.00

Public - County

Renovation

58

22

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Radiation Protection
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
116
Bidding Soon
2,453
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

April 21, 2025

img_map_placeholder

800 Olive St, Coatesville, PA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovation of Scott Middle School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.