BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Site work and paving for a sidewalk / parking lot in Lincoln City, Oregon. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Design and Construct Sidewalks Along Us101 From 39th St to Holmes Rd to Create a Safer Environment for Pedestrians. Will Also Examine the Possibility of Adding Bike Lanes and Pedestrian Crossing(S) Where Funding Allows. Work Type : Bikped, Adap Mileposts : 112.92 to 113.36 Length : 0.44 Route : Us-101 Highway : Oregon Coast Highway County - Lincoln As of March 24, 2026 , the project is in Conceptual status Anticipated letting date is 24-09-2026 ORDOT - US101: 39th St to Holmes Rd (Lincoln City) *project Information Has Been Obtained Through a Public State Transportation Improvement Plan (Stip). A Stip is a Financial Schedule for Short- and Long-range Projects Which is Updated Regularly. Information Listed in the Stip Often Evolves Based on Funding Availability. The Project Details, Including Timeline and Value, Are Subject to Change. The Content Management Team Will Continue to Pursue Additional Details as They Become Available.

Conceptual

Sidewalks / Parking Lot

$1,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
3
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2027

Project location map

US-101, Lincoln City, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.