BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2024 at 7:00 PM

Updated December 17, 2024

This is a service / maintenance or supply contract in Oneill, Nebraska. Contact the soliciting agency for additional information.

Sealed proposals for the Steel H-Pile, Steel Sheet Pile, Sub-Structure Steel, SuperStructure Steel, Metal Decking, Deck Reinforcing Steel, and Bridge Guardrail for an 65'-0" long by 24'-0" wide roadway bridge in Holt County, Nebraska, "Steel Material for HoltKnox Countyline Bridge Replacement Project" . Proposals will be taken for the steel material fabricated and delivered to the jobsite above by unit prices combined as an aggregate bid for the project. Holt County and Knox County forces will be responsible for the removal of the existing bridge, construction of the proposed bridge, and the dirt work/grading operations. The bridge crosses the Middle Branch of Verdigre Creek and is located 1.9 North of the intersection of Old 108 / 872nd Road and the HoltKnox Countyline. To drive to the bridge site, start at the intersection of 872nd Road and 510th Avenue, travel 1.9 miles North 510th Ave to the jobsite. All proposals for said work must be made on blanks furnished by the County Highway Superintendent and must be accompanied by bid security of not less than 5% of the amount bid. Bid security to be made payable to the County Clerk of Holt County, Nebraska, and will be held by Holt County as liquidated damages in case the bid is accepted and the bidder neglects or refuses to enter into contract and furnish bond in accordance herewith. The Holt County Supervisors reserve the right to waive informalities and irregularities and to make awards on bids that furnish the steel material that will, in their opinion, serve the best interests of Holt County, Nebraska. The Holt County Supervisors also reserve the right to reject any or all bids.

Post-Bid

Bridges / Tunnels

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
7
Bidding Soon
153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2024

January 15, 2025

Project location map

Multiple Locations, Oneill, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.