Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work and paving for a civil project in Bryan, Texas. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project Scope: The project scope consists the construction of a Lift Station with a 12' Diameter x 26' deep concrete wet well, two Hydromatic S4T(X)P, control, power, electrical supply, 3000' gravel access road, and all associated work as shown on the drawings and Bid Forms The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. The selected Offeror will be also responsible for: obtaining all applicable permits and inspections; providing all necessary performance and payment bonds and insurance certificates; and providing the Owner with all manufacturers' warranties and all operations and maintenance (O & M) manuals for all equipment installed. The selected Offeror may be required to perform some or all of the following pre-construction and construction services. Preconstruction Services may include, but not necessarily be limited to, planning and value engineering the Work. Construction Services may include, but not necessarily be limited to, all work associated with construction, occupancy and warranty of the facilities Location: The Project is located north of FM 1179 behind Stella Circle and the Wickson Water Tower. The site is roughly one mile north of the water tower adjacent to Wickson Creek Tributary 22. o March 3, 2025 - Anticipated date of Notice to Proceed o July 13, 2025 - Targeted Completion Date of Construction Project Estimated Budget: The proposed estimated budget for construction costs for this Project is $1,600,000 inclusive of all incidental and contingent expenses associated with the construction of the entire scope of the Project. Project Estimated Completion Date: The City has established a target commencement date for construction activities as JULY 13, 2025. The projected completion date is estimated to be 100 working days. The City reserves the right to modify the commencement date, subject to Owner and Contractor availability, phase the construction of the Project, or modify the schedule as needed and determined by the City due to modifications in scope. Question Deadline 12/17/2024 at 10:00 AM CT All questions related to this Request for Proposals shall be addressed in writing, via the Online. PN - 128-0073

Final Planning

Water / Sewer

$1,600,000.00

Public - City

Paving, Site Work

52

33

9

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
3
Bidding Soon
1,812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

August 6, 2025

Project location map

FM1179, Bryan, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.