Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 6, 2025 at 8:00 PM
Updated July 15, 2025
This is a service / maintenance or supply contract in Natick, Massachusetts. Contact the soliciting agency for additional information.
Amendment 9 (July 02,2025) Revised the solicitation to correct Section 00 21 16- Instructions to Proposers to correct proposal submission date and time to 14 July 2025 at 01:00 PM EST. There are no other changes at this time. As a result the following documents have been added: W911QY-25-R-0003 RFP amendment 0006 02 July 2025 W911QY-25-R-0003 RFP amendment 0006 02 July 2025 Conformed Copy Amendment 6 (June 18,2025) Revises the and adds and answers. The amended 1442 has been added as attachments to this . A conformed copy of the 1442 has also been added which includes all changes to date. As a result of the and answers the following documents have been added: Revised Attachment 2 Cost Proposal Revision 06182025 Bldg 45 Reno Addendum 1 EM 385-1-1 Effective 15 March 2024 Seed Project SOW Attachment 5 Submittal Registry Tax Exempt Form Unified Facilities Criteria (UFC 4 010) DoD Minimum Antiterrorism Standards for Building. W911QY25R0003 and Responses Master 06182025 W911QY-25-R-0003 RFP amendment 0004 18 June 2025 W911QY-25-R-0003 RFP amendment 0004 18 June 2025 Conformed Copy Amendment 5 (June 11, 2025) Revises the due date and time. This amendment extends the due date until 30 June 2025 and revises the proposal due time to 3:00 PM EST. This extension is not captured on the Standard Form 1442, at this time. The Standard Form 1442 will be updated and revised based on responses to . The Government anticipates posting the responses to all received by next week. At that time a revised Standard Form 1442 will be posted to reflect the corrected due date and any necessary changes. Amendment 4 (June 04, 2025) Revises the 1442 (Revision 0002 and Revision 0003) to change the Contracting Officer from Timothy Konetzny to Brandon Rivett. The 1442s have also updated with a revised proposal due date of 20 June 2025 5:00 PM EST. The amended 1442s have been added as attachments to this . A conformed copy of the 1442 has also been added which includes all changes to date. This amendment updates the final date and time to submit regarding this to June 11, 2025 by 11:59 am EST. All that have previously been submitted, if not answered by the posting of this amendment, must be resubmitted in writing to brandon.j.rivett.civarmy.mil and alexandra.m.biro2.civarmy.mil. The proposals shall be submitted to brandon.j.rivett.civarmy.mil and alexandra.m.biro2.civarmy.mil. Any proposals that have already been submitted shall be resubmitted to brandon.j.rivett.civarmy.mil and alexandra.m.biro2.civarmy.mil. An excel document with the sign in sheet has been attached. Due to readability issues with the hand signed information, a best guess was used when inputting data. Amendment 3 (May 23, 2025) provides current received with Government responses. Only with responses are provided. Amendment 2 (May 23, 2025) specified timeframe for submitting and anticipated Government responses while providing first set on with Government responses. The final date and time to submit regarding this shall be June 05, 2025 by 11:59 am ET. The anticipated date for the Government to provide final responses to submitted within this time frame is June 10, 2025 by the end of the day. As are received in response to this the Government will provide periodic responses via a amendment. Amendment 1 (May 14, 2025) updated the NAICS Code and size standard in the posting, revised the 1442, revised the date, replaced Attachment 3 - Seed Project SOW and Seed Project SOW Attachment 5 - Submittal Register word documents with PDFs. This notice serves as a formal Request for Proposal (RFP) from the Natick Contracting Division (Army Contracting Command), Soldier Systems Center, Natick, MA, for an Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple-Award Task Order Contract (MATOC) with a maximum potential of an 8-year ordering period, and a total shared capacity of 99,000,000.00 amongst all schedule holders. This Multiple-Award Task Order Contract (MATOC) is for various types of general, ion-related work, including new ion, alterations, renovations, repairs, and design-build work for a broad range of requirements in support of the Natick Soldier Systems Center (NSSC) located in Natick, MA. Work performed under this effort will include, but is not limited to the following specialties: ion, repair and alteration of various facilities; ion, repairs and alteration of electrical systems; ion, repair and alteration of mechanical systems (e.g. heating, ventilation, and air conditioning systems and controls); Concrete and asphalt paving; Demolition of facilities; Remediation; and Design support. A task order will be issued to each successful MATOC contractor (up to ten (10) total awards), in the amount of 1,000.00, and will be sent within thirty (30) days of the base contract award. Additionally, a "seed" project for a renovation project will be evaluated in conjunction with the primary MATOC requirements to determine overall offeror capabilities. The Government has determined that this acquisition will be set aside 100 for small business concerns. The Disclosure of Magnitude for the seed project is estimated between 1M and 5M. The North American Industrial Classification System Code (NAICS code) is 236220 - Commercial and Institutional Building ion, with a small business size standard of 45.0 Million. Please refer to the supplemental attachments located within this Notice, including the formal document no. W911QY25R0003.PDF and amendments, for further details and instruction regarding this RFP.
Post-Bid
Military
$100,000,000.00
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2025
March 16, 2026
10 General Greene Ave, Natick, MA
Related To This Project
Natick, MA
Bid Date: Mar 11 2019
Natick, MA
Bid Date: Jan 22 2025
Natick, MA
Bid Date: Dec 27 2024
Natick, MA
--
Natick, MA
--
Natick, MA
Bid Date: Dec 18 2024
Natick, MA
--
Natick, MA
Bid Date: Dec 09 2024
Natick, MA
Bid Date: Dec 09 2024
Natick, MA
Bid Date: Nov 21 2024
Natick, MA
--
Natick, MA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
